Laserfiche WebLink
LLNL Emergency Management Plan (EPlan) <br />Rev 27 <br />January 2022 <br /> <br /> 101 <br />• Requesting support staff/liaison (e.g., ES&H, Security, Public Affairs) be assigned to the <br />recovery team <br />• Managing the recovery effort <br />• Coordinating Laboratory interactions with contractors, vendors, and offsite organizations <br />• Communicating and coordinating with offsite Federal, State, and local officials as needed <br />• Approving media releases (in coordination with the EBCC and NNSA/LFO) regarding <br />recovery <br />• Ensuring that recovery operations are documented <br />Once the emergency has terminated, the appointed Recovery Manager reports to the Laboratory <br />Director and/or EBCC. Since the EOC needs to be ready to activate in response to another <br />Operational Emergency, the recovery team will most likely work out of a location other than the <br />EOC, such as the EBCC, a DOC, or other available facility. <br />11.2.2 Reentry Phase <br />Any facility that shows evidence of structural damage should not be entered by unqualified <br />personnel. Fire Department personnel, assisted by Structural Evaluation Assessment Field Teams <br />and ES&H Teams, are qualified to enter a structurally-damaged building for situation assessment <br />and recovery planning. <br />Where structural damage has clearly not occurred, reentry activities at a facility and locally <br />affected areas are initiated when the emergency conditions have stabilized such that damage <br />assessments can be safely accomplished. These activities should be conducted prior to the <br />termination of the emergency to assist in recovery planning, or they may be conducted post- <br />termination during the recovery phase of operations. The reentry plan should also describe: areas <br />to be surveyed, anticipated contamination levels, protective equipment and shielding <br />requirements, decontamination requirements and communications requirements. The Recovery <br />Manager or ES&H Team Leader is normally responsible for the reentry phase during the post- <br />termination recovery phase. <br />11.2.3 Recovery Phase <br />Once conditions have stabilized and termination of the emergency has been recommended, the <br />recovery phase may be initiated. Steps in this process may include: <br />• Assessment of the health and safety of potentially affected workers <br />• Assessment of hazards from the impacted facilities <br />• Assessment of the airborne release or ground spill <br />• Assessment of damage to critical systems and functions <br />• Assessment of potentially-compromised security systems <br />• Assessment of the root cause of the event (accident investigation)