Laserfiche WebLink
LLNL Emergency Management Plan (EPlan) <br />Rev 27 <br />January 2022 <br /> <br /> 38 <br /> Figure 2.4 LLNL Emergency Operations Center Organization and Interfaces <br />2.3.2.1 Emergency Management Team <br />The Emergency Management Team includes four positions, plus several additional personnel <br />who assist management, as described below. <br />The Emergency Management Team consists of the following positions: <br />• ED – Always filled by the on-duty LEDO unless replaced due to succession issues. <br />• Liaison Officer – Filled by back-up LEDO. <br />• EMC – Filled by a senior member of the LLNL EMD. <br />• PIM – Filled by LLNL Director of Public Affairs or designee. <br />Other positions supporting the Emergency Management Team are: <br />• NNSA/LFO Emergency Manager – Federal oversight, serving on behalf of the Field <br />Element Manager. <br />• Newswriter – Located in Public Affairs Office (PAO) or EOC, but directly reports to the <br />PIM. <br />• EOC Coordinators – One covers P&I/Operations/Logistics/Finance and Administration <br />Sections; and one is roving as needed. All report to the EMC.