My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
1900 - Hazardous Materials Program
>
PR0519994
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2022 10:01:11 AM
Creation date
4/5/2022 9:58:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0519994
PE
1921
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LLNL Emergency Management Plan (EPlan) <br />Rev 27 <br />January 2022 <br /> <br /> 86 <br />8.2 Protective Action Implementation <br />8.2.1 Objective <br />The primary objective of protective actions is to limit individual doses or exposures. In the short- <br />term, this may be accomplished by taking action (e.g., shelter-in-place) to keep exposure levels <br />below the thresholds for severe early health effects. In the longer term, additional actions may be <br />required to reduce or avoid additional exposure (e.g., evacuate populations), which may cause <br />temporary exposure to higher plume concentrations than would occur during shelter-in-place, for <br />the purpose of avoiding a higher dose over an extended period of time, thereby producing a <br />positive net benefit. The overall risk to workers and the public should be limited, to the extent <br />practicable, by reducing the population or collective dose (or exposure). Protective actions, when <br />implemented individually or in combination, accomplish this objective. <br />Following implementation of initial protective actions and prior to activation of the EOC, the IC <br />and EMDO will continuously evaluate the situation, including operational and weather <br />conditions, to determine if modifications to the initial protective actions are warranted. After the <br />EOC becomes operational, the IC retains responsibility for protecting only what is defined as the <br />incident scene. Any onsite areas outside of the incident scene fall under the protection of the ED. <br />The IC and the ED must therefore have a conversation to define and agree on what falls within <br />the incident scene onsite. This decision should be briefed to responders at the scene and to the <br />ERO. Protection of offsite areas always remains the responsibility of the IC; however, it is the <br />duty of the ED to issue protective action recommendations to the IC, as well as to offsite <br />authorities. <br />8.2.2 Onsite Protective Actions <br />Evacuation and/or sheltering are likely to be the most effective protective actions that can be <br />taken to minimize risk to workers close to the event scene. Workers closest to the scene of an <br />emergency will probably be subjected to the highest risk from the effects of the accident <br />conditions with the least warning time. Depending on the particular circumstances of the <br />emergency, either method of protective actions, or a mix of the two, may be implemented to <br />avoid or minimize the exposure of individuals to the hazardous materials (chemical, radiological, <br />or biological) released. <br />Sheltering may be the appropriate protective action when: <br />• Workers have access to a facility that provides protection <br />• The dose or exposure will be less than that associated with evacuation <br />• It places workers in a position where additional instructions can be rapidly disseminated <br />• Rapid evacuation is impeded <br />• Plume arrival is imminent <br />Actions performed to shelter include closing doors and windows, turning off external make-up <br />air for HVAC if possible, and remaining indoors until an “all clear” is issued by the IC or ED.
The URL can be used to link to this page
Your browser does not support the video tag.