Laserfiche WebLink
BMP INSPECTION REPORT <br />Date and Time of Inspection: <br />Week of 11-22-21 <br />Date Report Written: <br />11-26-21 <br />Inspection Type: <br />(Circle one) <br />Weekly <br />Complete Parts <br />1, ll, Mand Vll <br />Pre -Storm <br />Complete Parts <br />1,11,111,1 V and V11 <br />During Rain Event <br />Complete Parts 1, ll, <br />111, V, and Vll <br />Post -Storm <br />Complete Parts <br />1, ll, III, VI and Vll <br />Part I. General Information <br />Site Information <br />Construction Site Name: <br />Victory Gardens <br />Construction stage and Graded. Buildings are being formed. <br />completed activities: Underground and plumbing occurring. <br />Approximate area <br />of site that is exposed: 2.5 Ac <br />Photos Taken: <br />(Circleone) <br />Yes <br />No <br />Photo Reference IDs.- <br />Ds:(Circle <br />Weather <br />Estimate storm beginning: N/A <br />(date and time) <br />Estimate storm duration: N/A <br />(hours) <br />Estimate time since last storm: No storm since project <br />(days or hours) commencement. <br />Rain gauge reading and location: 0 inches <br />(in) <br />Is a "Qualifying Event' predicted or did one occur (i.e., 0.5" rain with 48-hrs or greater between events)? (Y/N) <br />If yes, summarize forecast: No <br />Exemption Documentation (explanation required if inspection could not be conducted). visual <br />inspections are not required outside of business hours or during dangerous weather conditions such as flooding <br />or electrical storms. <br />Inspector Information <br />Inspector Name: <br />Joe Murphy <br />Inspector Title: <br />Engineer <br />Signature: <br />Date: <br />11/26/20,21 <br />CASQA SW IT Template 121 July 2012 <br />