Laserfiche WebLink
Part VI. Additional Post -Storm Observations. Visually observe (inspect) stormwater <br />discharges at all discharge locations within two business days (48 hours) after each qualifying <br />rain event, and observe (inspect) the discharge of stored or contained stormwater that is derived <br />from and discharged subsequent to a qualifying rain event producing precipitation of % inch or <br />more at the time of discharge. Com tete Part VII Corrective Actions as needed. <br />Discharge Location, Storage or <br />Containment Area <br />Visual Observation <br />Part VII. Additional Corrective Actions Required. Identify additional corrective actions not <br />included with BMP Deficiencies (Part III) above. Note if SWPPP change is required. <br />Required Actions <br />Implementation Date <br />CASQA SWPPP template 126 July 2012 <br />