Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank 1D (one OPE per column) 87-1 e7-2 91 <br /> Are both vent and tank riser piping V/ Yes V/ Yes y/j Yes Yes <br /> secondarily contained? No No 7No No <br /> OPE Model OPw OPw OPw <br /> What is the OPE response when activated? 21 Shut off /J Shut off A Shut off Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> estricts estricts estricts Restricts <br /> Flow Flow Flow Flow <br /> Audible Audible Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual Visual Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* Yes* Yes* Yes* <br /> that may interfere with the OPE operation? ✓ No No EV( No No <br /> At what level in the tank is the OPE set to <br /> activate? Inches from bottom of tank H2.50" 78.50" 80.50" <br /> What is the percent capacity of the tank at <br /> 94.87$ 91.39% 93.20 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to �/ Yes Yesj Yes Yes <br /> respond when the stored substance No No No No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results �/ Pass �/ Pass �/ Pass Pass <br /> Fail Fail Fail Fail_P <br /> S. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />