My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 4:58:45 PM
Creation date
4/12/2022 10:19:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank 1D (one OPE per column) 87-1 e7-2 91 <br /> Are both vent and tank riser piping V/ Yes V/ Yes y/j Yes Yes <br /> secondarily contained? No No 7No No <br /> OPE Model OPw OPw OPw <br /> What is the OPE response when activated? 21 Shut off /J Shut off A Shut off Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> estricts estricts estricts Restricts <br /> Flow Flow Flow Flow <br /> Audible Audible Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual Visual Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* Yes* Yes* Yes* <br /> that may interfere with the OPE operation? ✓ No No EV( No No <br /> At what level in the tank is the OPE set to <br /> activate? Inches from bottom of tank H2.50" 78.50" 80.50" <br /> What is the percent capacity of the tank at <br /> 94.87$ 91.39% 93.20 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to �/ Yes Yesj Yes Yes <br /> respond when the stored substance No No No No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results �/ Pass �/ Pass �/ Pass Pass <br /> Fail Fail Fail Fail_P <br /> S. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.