My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 4:58:45 PM
Creation date
4/12/2022 10:19:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
®&rrys-RYAN INC. Exhibit 8 GR lob# 22202625 <br /> Required Items in Conducting P-201.3 <br /> (Executive Orders VR-201-M and VR-202-M) <br /> The instructions below are required when conducting TP-201.3 for these systems. The <br /> tester shall document that each step was followed as indicated below and shall include <br /> this page of the Exhibit with the submission of TP-201.3 test results. Note that districts <br /> may require use of an alternate form to meet these requirements, provided the alternate <br /> form includes the same minimum parameters. <br /> 1. Prior to conducting TP-201.3, all four ball valves on the Healy Clean Air <br /> Separator (CAS) shall be closed, as shown in Figure 1 or Figure 1H, to isolate it <br /> from the Underground Storage Tank (UST) system to permit the pressurization <br /> of the UST system. Figure 1 applies to vertical CAS installations and Figure 1H <br /> applies to horizontal CAS installations. <br /> 2. Conducting TP-201.3 with any dispenser piping test valve in the closed position <br /> is not permitted. Any dispenser with a dispenser piping test valve in the closed <br /> position while conducting TP-201.3 will bias the test towards compliance. <br /> 3. After conducting TP-201.3, the four ball valves on the Healy Clean Air Separator <br /> (CAS) shall be locked in their normal operating positions as shown in <br /> Figure 28-2 or 26-21-1, Exhibit 2 of Executive Orders VR-201-M and VR-202-M. <br /> Figure 2B-2 applies to vertical CAS installations and Figure 213-21-1 applies to <br /> horizontal CAS installations. <br /> Required Steps Verification <br /> (please check Yes or No) <br /> 1.All four CAS ball valves closed before conducting TP-201.3 <br /> �✓ Yes FNo <br /> 2.All dispenser piping test valves open before conducting <br /> TP-201.3 ❑✓ Yes E]No <br /> 3.All four CAS ball valves in normal operating position after <br /> conducting TP-201.3. E✓ Yes E]No <br /> Testing Company: Gettler-Ryan Inc. Facility Name: Arco 5450 <br /> Robert Jacobs 7/8/2022 <br /> Print Name(Technician) Signature Date <br /> 8819943, Exp. 8/9/2023 <br /> Technician Certification Number and Expiration Date <br /> (ICC or District Training Certification, as Applicable) <br /> Items Required in Conducting TP-201.3, Exhibit 8- Executive Orders VR-201-M and VR-202-M <br />
The URL can be used to link to this page
Your browser does not support the video tag.