Laserfiche WebLink
AMndix B &-I- 2- <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion(AHA and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take Into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled In the tank: <br /> Distance from the 71 SO inlet tulle flange to the cast <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend In the tube. <br /> (n)_-& .-15 <br /> .._ <br /> Distance from the 7150 inlet tube flange to the top and <br /> bottom of lower tube,valve length. <br /> (H►1= <br /> (U)= Upper <br /> Tube <br /> Distance from the 7150 inlet tube flange to the bottom _ <br /> of the tank. Note:if a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 &61 TP models add 0.6") (tM1ll Valve <br /> (B)= 5 Length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number(Y) which corresponds L <br /> to the 100%volume. (8) <br /> (Y)=- To Tank <br /> 1. To determine shut-off {Y) <br /> percentage: Tank <br /> Subtract upper tube length(D)from distance to tank (U)Valve Chart <br /> bottom(B) Length, 100% <br /> (X)=(B)-(D)-2"= top of cut Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated(X)dimension and the 100°x6 volume(Y)tank � <br /> capacity, <br /> (X)tank capacity in gallons= �` 1 <br /> (Y)tank capacity in gallons= <br /> SO%=(X)capacity/(Y)capacity x100 <br /> Note: The overfill valve must be installed per AHJ require- <br /> ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95::x. <br /> 21 <br />