My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085141_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
17650
>
2600 - Land Use Program
>
SR0085141_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 2:46:54 PM
Creation date
4/14/2022 1:34:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0085141
PE
2602
FACILITY_NAME
JOSE VALDOVINOS
STREET_NUMBER
17650
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20820015
ENTERED_DATE
4/13/2022 12:00:00 AM
SITE_LOCATION
17650 AUSTIN RD
P_LOCATION
04
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eastern San Joaquin Groundwater Basin Groundwater Management Plan <br /> Table ES-7 Integrate Conjunctive Use Pro ram Elements <br /> Supply Water Rights and Contracts Storage/Conveyance GW Recharge <br /> Source <br /> 350 cfs diversion at Freeport • Proposed Duck Creek • Farmington Program <br /> > Reservoir 0 GW Recharge and <br /> iY from Dec. 1 to June 30 SJC Freeport Conjunctive Use <br /> Currently limited to 155 cfs by ASR Wells <br /> Interconnect <br /> EBMUD's pipeline Alliance Canal • Third Party Banking and <br /> (Average Annual Yield =44,000 <br /> Eaf) Freeport Regional Conjunctive Use <br /> Water Project Partnerships <br /> • MORE WATER Project <br /> Tunnel and Pipeline <br /> • 1000 cfs diversion to storage 0 MORE WATER Project Proposed Duck Creek <br /> Dec. 1.to June 30 Lower River Diversions 0 Lodi Recharge or use of <br /> • 620 cfs direct diversion 0 Woodbridge Dam 6,000 of transfer <br /> • (Average Annual Yield =60,000 Replacement and • Farmington Program <br /> c - 100,000 af) Existing Canal System 0 In-lieu and direct recharge <br /> E 39,000 to 60,000 of to WID 0 Existing South System by Districts <br /> Y 20,000 of to NSJWCD subject and North System 0 Third Party Banking and <br /> 0 to others Rehabilitation Conjunctive Use <br /> 75 <br /> • (Average Annual Yield = 11,000 • NSJWCD-Bear Creek, Partnerships <br /> af) Pixely Slough, Paddy 0 ASR Wells <br /> Creek, Gill Creek <br /> • Alliance Canal <br /> • Farmington Program <br /> • 100,000 of 56.5%to SEWD and • Treatment Plan Expansion - <br /> 43.5%to CCWD 0 Peters Pipeline Urban In-lieu <br /> By agreement, SEWD is • Mormon Slough In-lieu and direct recharge <br /> m allowed to utilize CCWD unused • Alliance Canal SJAFCA and Other Storm <br /> supply South Gulch Reservoir Water Detention Ponds <br /> 0 • 13,000 ac-ft riparian demand • Third Party Banking and <br /> Conjunctive Use <br /> Partnerships <br /> • 155,000 of contract to 0 Farmington Program <br /> SEWD/CSJWCD Treatment Plant Expansion <br /> L Peters Pipeline 75,000 of interim to SEWD • Lathrop, Manteca, and <br /> CSJWCD-Lone Tree, <br /> • 49,000 affirm and <31,000 ac-ft Escalon In-lieu <br /> Duck Creek,Temple <br /> interim to CSJWCD In-lieu and direct recharge <br /> C6 Joaquin Creek, Littlejohns Creek <br /> 320,000 af(In San Joa <br /> ( 4 Alliance Canal SJAFCA and Other Storm <br /> County) . South County Water Water Detention Ponds <br /> c 34,000 of(South County Project Supply Project Third Party Banking and <br /> In-basin delivery) Conjunctive Use <br /> • 30,000 of transfer to SEWD Partnerships <br /> • Farmington Program <br /> • Farmington Canal 0 CSJWCD Surface Water <br /> 0 CSJWCD-Lone Tree, Incentive Program <br /> • 250,000 of Dec. 1 to April 30 Duck Creek,Temple • In-lieu and direct recharge <br /> U U 60,000 of direct diversion Creek, Littlejohns Creek by Districts <br /> U • 190,000 of to storage Alliance Canal Third Party Banking and <br /> 0 0 (Average Annual Yield = 15,000 af) Farmington Canal to Conjunctive Use <br /> USouth Gulch Partnerships <br /> • Lyons Dam Project 0 SJAFCA and SJCOG Storm <br /> Water Detention Ponds <br /> • City of Stockton Delta Water 0 Stockton In-lieu and ASR <br /> Supply Project Wells <br /> Initially 20,000 of increasing to Pipeline and Treatment e Third Party Banking and <br /> p 125,900 of in 2050 Facility Conjunctive Use <br /> • (Average Annual Yield =60,000 Partnerships <br /> of) 0 Farmington Program <br /> Northeastern San Joaquin County Executive Summary <br /> Groundwater Banking Authority 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.