Laserfiche WebLink
Eastern San Joaquin Groundwater Basin Groundwater Management Plan <br /> 1964 and a final agreement in 1970 guaranteeing 56.5% of New Hogan Reservoir's yield to the <br /> District. <br /> Prior to 1963, the SEWD's basic financial structure rested upon a tax on land. In 1963, the <br /> Governor of California signed a bill that established groundwater use fees and surface water <br /> charges that could be levied by the SEWD. The additional revenues were used by the SEWD to <br /> contract for New Hogan water. The SEWD began registering wells within their boundaries. <br /> Check dams were built on the Calaveras River, Mormon and Mosher Sloughs for control of <br /> surface irrigation water and to promote groundwater recharge. SEWD became actively involved <br /> in the pursuit of projects to mitigate declining groundwater levels and to prevent the further <br /> intrusion of saline groundwater. <br /> In 1971, SEWD boundaries were expanded to include the entire Stockton urban area. SEWD <br /> began plans for a 30 MGD treatment plant to serve the urban area. In 1975, a $25 million bond <br /> issue was passed by the SEWD wide election to fund the water treatment plant. The plant was <br /> completed in 1977 and went on line in 1978 to reduce the groundwater pumping depression <br /> under the urban area and the affects of saline intrusion on urban wells near the Delta. In 1979 <br /> the Independent Benefit Commission concluded that the treatment plant was a benefit to the <br /> planning areas. SEWD began to assess 14,000 of of additional agricultural acres. The total <br /> area within SEWD is approximately 116,300 acres, of which 47,600 acres (approximately 41%) <br /> are within the City of Stockton. WID and SEWD share approximately 9,700 acres in North <br /> Stockton. <br /> SEWD has actively sought supplemental surface water from the American River via the Folsom <br /> South Canal and from the New Melones Reservoir. Efforts to obtain the American River supply <br /> have been thwarted by the Environmental Defense Fund (EDF), EBMUD litigation and the <br /> Freeport Regional Diversion Project litigation. The District and Central San Joaquin Water <br /> Conservation District (CSJWCD) contracted with the USBR in 1983 for 75,000 and 80,000 of of <br /> water respectively from New Melones Reservoir. In 1983, the District expanded surface water <br /> irrigation with the construction of the 12,000 gpm Potter Creek Pump Facility. <br /> The Water Treatment Plant capacity was increased in 1991 to accommodate increased demand <br /> from the Stockton Urban areas. Construction on the New Melones Conveyance System was <br /> completed in 1994. Under the Central Valley Project Improvement Act (CVPIA), the USBR <br /> provided no water to SEWD in 1993 and 1994. In 1995 SEWD began receiving New Melones <br /> water, but less than the contracted amount because of the Miller-Bradely bill requirements <br /> regarding water quality issues on the San Joaquin River and fish flows. Legal action is ongoing. <br /> Under current USBR operation of New Melones, SEWD and CSJWCD are provided up to <br /> 90,000 of water from New Melones annually. Water allocation is based on March-September <br /> water forecast plus February end-of-month storage in New Melones. <br /> In 1995, SEWD adopted an AB3030 Groundwater Management Plan. The goal of their Plan is <br /> to continue past efforts to seek supplemental surface water supplies for conjunctive use, to <br /> protect existing supplies, and to further pressure the USBR to meet the contracted delivery <br /> amounts for New Melones water. <br /> In 1997, the District entered into a water transfer agreement with Oakdale Irrigation District <br /> (OID) and South San Joaquin Irrigation District (SSJID). This agreement is for 8,000 to 30,000 <br /> of allocation based on New Melones storage and inflow as of April 1 of each year. The contract <br /> period ends 2009 with a possible 10-year renewal pending further studies. <br /> Northeastern San Joaquin County Section 1 <br /> Groundwater Banking Authority 30 Introduction <br />