My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085141_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
17650
>
2600 - Land Use Program
>
SR0085141_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 2:46:54 PM
Creation date
4/14/2022 1:34:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0085141
PE
2602
FACILITY_NAME
JOSE VALDOVINOS
STREET_NUMBER
17650
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20820015
ENTERED_DATE
4/13/2022 12:00:00 AM
SITE_LOCATION
17650 AUSTIN RD
P_LOCATION
04
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eastern San Joaquin Groundwater Basin Groundwater Management Plan <br /> continued to promote the goals of the Plan through the support of other agencies, the facilitation <br /> of the Advisory Water Commission and the Authority. <br /> San Joaquin County Groundwater Monitoring Program — Since 1971, the San Joaquin <br /> County Flood Control and Water Conservation District has monitored groundwater levels and <br /> groundwater quality on a semi-annual basis. Over 300 wells are sampled by the District, and <br /> data from an additional 200 wells are incorporated into the groundwater level database. <br /> Groundwater levels are published in both the spring and fall reports. Groundwater quality data <br /> is collected once a year in the fall months for publication in the Fall Groundwater Report. <br /> In 2000, the County completed an evaluation of the existing groundwater monitoring program in <br /> order to identify its adequacy. The evaluation concluded that the groundwater monitoring <br /> program is relatively adequate for groundwater levels, but does not collect enough saline water <br /> intrusion data. The recommendation was to increase the groundwater quality monitoring effort <br /> and perform an extensive hydrogeologic investigation of the Groundwater Basin in the region of <br /> the saline front. In 2002, the County worked with the DWR to drill two multiple depth well <br /> clusters in the City of Stockton along the projected saline front. Additionally, a joint study with <br /> the US Geologic Survey, the DWR, and member agencies of the Authority could further the <br /> efforts to better understand saline groundwater intrusion and the overall hydrogeology of the <br /> Basin. <br /> Mokelumne River Water Right Applications — In 1990, the Mokelumne River Water and <br /> Power Authority (MRWPA) filed with the State Water Resources Control Board (SWRCB) Water <br /> Right applications for unappropriated wet year flows on the Mokelumne River and obtained a <br /> Federal Energy Regulatory Commission (FERC) Preliminary Permit to further study the <br /> associated power generation potential. The application sought to capture water behind a new <br /> on-stream dam located at Middle Bar upstream of Pardee Reservoir or at a site off-stream at the <br /> proposed Duck Creek Reservoir. The Application also included the ability for County interest to <br /> divert wet year flows off of the Lower Mokelumne River from Camanche Dam to Interstate 5. <br /> In 2003, the MRWPA retained the services of HDR Engineering, Inc. to move forward the <br /> Mokelumne River Regional Water Storage and Conjunctive Use Project (MORE WATER <br /> Project) and prepare the necessary environmental documentation to perfect the water right <br /> applications and obtain all necessary permissions. The MORE WATER Project could potentially <br /> bring 60,000 — 100,000 of/yr to the Basin. <br /> American River Water Right Applications — In 1990, the County also filed an application for <br /> unappropriated flows on the American River. The Application seeks to divert and store water <br /> between December 1 and June 30 from Nimbus Dam via the Folsom South Canal on the Lower <br /> American River and from the South Fork of the American River via a series of proposed <br /> pipelines and reservoirs. The County has amended its application in order to divert American <br /> River water from the Sacramento River at Freeport as well. The size of the Freeport diversion <br /> limits the amount of potential water delivered San Joaquin County under the amended <br /> application. The potential annual average yield to the County using the Freeport Project <br /> capacity is estimated at 44,000 of/yr. <br /> 1.6.4 Overview of Groundwater Management Outside the GMA <br /> Calaveras County Water District— Calaveras County Water District's (CCWD) boundaries <br /> coincide with the boundaries of Calaveras County. Approximately 70 square miles of the <br /> Camanche and Valley Springs areas in Calaveras County overly the Eastern San Joaquin <br /> Groundwater Sub-basin. In 2001, CCWD adopted an AB 3030 Groundwater Management Plan <br /> Northeastern San Joaquin County Section 1 <br /> Groundwater Banking Authority 36 Introduction <br />
The URL can be used to link to this page
Your browser does not support the video tag.