IiX11113PP E <br />PROPOSED WORK PLAN <br />Section 205 (j) Ground Water Study <br />Santos Ranch Development <br />San Joaquin County California <br />15 August 1984 <br />Task I - Sample up to 40 wells throughout the Santos Ranch Development <br />on a quarterly basis for 1 year. Resulting in up to 160 water <br />sample analysis looking for NO3, TDS, some biological indicators <br />and others as identified by initial testing. <br />Task 11 - Back hoe excavation to 12' or ground water to establish depth <br />of soil cover to water. <br />Task III - Set up to 20 semi permanent shallow test wells throughout <br />the development. Four or six inch diameter PVC perferated <br />pipes with caps to check ground water level six times per year <br />for one or two seasons. <br />Task IV - Topography Map of Santos Ranch development with 2' contour <br />intervals and 40 spot elevations. <br />Task V - Catalog and evaluate data from Tasks 1 through IV. <br />Task VI - If warrented, prepare alternative feasibility plans, cost estimates <br />and financial plans for implimenting action as needed. <br />Task VIII - Write report and make recommendations. <br />Tusk Vill - hold Public hearings and progress meetings with County, State <br />and Federal staff as needed. <br />