Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: Stockton Mobil#1 -642 N HUNTER ST Stockton CA 95204 <br /> T . . . CAR t <br /> . . . . WASH I . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 1. . .3 5. . 7. 9. . 11 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . �. �. n. . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . .E-STOP. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . 2. .4 6. 8. .10.� 12. . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . �. . . . . �. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> MAP KEY: <br /> A=ANNULAR SENSOR . .87.2 O DIE.. <br /> F=FILL F V O <br /> P=PROBE a x <br /> V=VAPOR X P . . . . . <br /> T= LAVE TURBINE p <br /> L=LEAK DETECTOR/TURBINE ' ' . . <br /> X=SENSOR <br /> 87O 00 0 <br /> *PIPING* . . . . . . . . . . . . . . 1 . . . . . <br /> (ARROWS) . . . . . . . . . . . . . . . . X <br /> Drawing of . . . . . . . . . . . . . . . . . . . . <br /> piping exit of . . . . . . . . . . . . . . . . . . . . <br /> sump and . . . . . . . . . . . . . . <br /> No underground <br /> L <br /> drawing is 91. <br /> O X <br /> accurate,we 4 F V <br /> cannot speculate _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ O . . . . . <br /> blue prints. <br /> . . . . . . . . . . . . P <br /> Any items underground that are not visible to the certifying technician are a <br /> professional opinion only and are solely for informational purposes. Drawing not to <br /> scale. <br /> Date map was drawn:5/15/21 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />