My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0083979 (5)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
821
>
2900 - Site Mitigation Program
>
SR0083979 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2022 12:17:57 PM
Creation date
4/21/2022 12:13:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0083979
PE
2903
FACILITY_ID
FA0023307
FACILITY_NAME
FORMER OCAMPO PROPERTY
STREET_NUMBER
821
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15131060
ENTERED_DATE
7/20/2021 12:00:00 AM
SITE_LOCATION
821 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05 August 2021 <br />Project No. 02-0926 <br />Page 2 of 2 <br />Joaquin County Environmental Health Department (EHD); additionally, the EHD will be <br />notified a minimum of 48-hours prior to commencement of well destruction activities. <br /> <br />Prior to well destruction activities, all wells will be checked for total depth and well integrity <br />using a Solinst water level meter. Any obstructions found in the wells will be removed. <br /> <br />AGI proposes to destroy wells MW-3, MW-4, MW-7, MW-8, MW-9, and MW-10 by over <br />drilling. The wells will be drilled-out to total depths of 50 feet bsg (MW-3 and MW-4) and <br />55 feet bsg (MW-7 through MW-10) utilizing a hollow-stem auger drill rig equipped with <br />8-inch diameter augers. All original well construction materials will be removed (including <br />well casing, screen, filter pack, and annular seal) by the drill rig to ensure that no residual <br />contamination is sealed within the abandoned borehole and a vertical conduit does not <br />remain. The boring will be completely backfilled to surface grade with a cement grout <br />mixture (Portland type II) and finished at the surface with native soil or concrete to match <br />the existing surface. The grout mixture will consist of a ratio of not more than six gallons <br />of water for every 94-pound sack of Portland type II cement. The drill rig hollow stem <br />augers will be utilized as a tremie pipe during deployment of the grout mixture. Any <br />groundwater displaced by the grout mixture will be routed into properly labeled <br />Department of Transportation (DOT)-approved 55-gallon drums. All investigation derived <br />waste will be containerized in properly labeled DOT-approved 55-gallon drums and <br />disposed as a non-hazardous waste. <br /> <br /> <br />3.0. REPORTING <br /> <br />Upon completion of field work and disposal of waste, a well destruction report describing <br />the activities and procedures, including documentation of waste disposal, will be <br />prepared, and submitted to the SJCEHD. The report will be in a format acceptable to the <br />SJEHD and will be reviewed and signed by a California Professional Geologist. <br /> <br /> <br />Sincerely, <br /> <br />AdvancedGeo, Inc. <br /> <br /> <br /> <br />______________________________ ___________________________ <br />Evan J. Schmidt Daniel J. Villanueva <br />Staff Geologist Senior Geologist <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.