My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9321
>
2300 - Underground Storage Tank Program
>
PR0231261
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 11:20:15 AM
Creation date
4/21/2022 12:58:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231261
PE
2361
FACILITY_ID
FA0002890
FACILITY_NAME
QUIK STOP MARKET #551120
STREET_NUMBER
9321
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
080-180-05
CURRENT_STATUS
01
SITE_LOCATION
9321 N THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer ❑fT Industry Standard 0 Professional Engineer <br /> Test Type © Pressure ® Vacuum E Hydrostatic <br /> Test Equipment Used: <br /> Sump/UDC ID Gasoline -87 Gasoline -91 Disp#1-2 Disp#3-4 <br /> Sump Manufacturer Unknown (FRP) Unknown (FRP Bravo Bravo <br /> Sump Depth (inches) 52 54 9 9 <br /> Sump Bottom to Top of 20 20 Bottom Bottom <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:40 10:40 10:40 10:40 <br /> Initial Reading 4.2322 2.0615 3.1434 .6416 <br /> Test End Time 10:55 10:55 10:55 10:55 <br /> Final Reading 4.2304 2.0608 3.1432 .6418 <br /> Change in Reading -.0018 -.0007 -.0002 .0002 <br /> Pass/Fail Criteria .002 .002 .002 .002 <br /> Tightness Test Results © Pass rl Fail E✓ Pass rl Fail7 Pass © Fail © Pass Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass Fail Criteria <br /> Tightness Test Results Pass 0 Fail 0 Pass Fail 0 Pass [r] Fail C Pass C Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.