My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
770
>
2300 - Underground Storage Tank Program
>
PR0546068
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 2:44:09 PM
Creation date
4/22/2022 1:43:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0546068
PE
2351
FACILITY_ID
FA0026052
FACILITY_NAME
7-ELEVEN STORE #41216
STREET_NUMBER
770
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323023
CURRENT_STATUS
01
SITE_LOCATION
770 W CHARTER WAY
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA KJ OAQ U I N Environmental Health Department <br /> — COUNTY <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name : Facility Address : Date: <br /> 7-ELEVEN STORE #41216 770 W CHARTER WAY, STOCKTON June 01 , 2022 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I, CLASS II, or MINOR - Notice to Comply) <br /> Item # Remarks <br /> 208 CCR 2716 (a-e) Failure to comply with the designated operator inspection requirements . <br /> OBSERVATION : Designated operator reports were not signed within the required time frame . <br /> -The 8/9/21 designated operator report was signed by the owner/operator on 8/ 16/21 . <br /> -The 9/7/21 designated operator report was signed by the owner/operator on 9/30/21 . <br /> -The 10/27/21 designated operator report was signed by the owner/operator on 11 /23/21 . <br /> REGULATORY GUIDANCE : Within 48 hours of the completion of the designated UST operator visual inspection , <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report, the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues . <br /> CORRECTIVE ACTION : Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future . <br /> ----------------------------------------------------------------------- <br /> OBSERVATION : The designated operator failed to check and note the correct test dates for the monitoring system <br /> certification on the designated operator inspection reports . The monitoring system certification date was listed as <br /> 5/25/21 . The correct date for the monitoring system certification is 6/18/21 . <br /> REGULATION GUIDANCE : During the inspection , the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done . <br /> CORRECTIVE ACTION : Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports . <br /> ------------------------------------------------------------------------------ <br /> OBSERVATION : The designated operator failed to check and note all required items on the visual inspection <br /> reports . The incorrect information included the following from the inspection reports : <br /> -On the 7/ 13/21 DO report, when asked if the monitoring system certification and spill testing had been completed <br /> within the last 12 months , ' NO' was answered . <br /> -On the 7/ 13/21 DO report, when asked if the overfill had been completed within the last 36 months , ' NO' was <br /> answered . <br /> REGULATION GUIDANCE : During the visual inspection , the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION : Ensure that designated operators performing visual inspections at this facility are including <br /> all of the required information on the reports . <br /> This is a minor violation . <br /> FA0026052 PRO546068 SCO01 06/01 /2022 <br /> EHD 23-01 Rev. 9/16/2020 Page 5 of 6 Underground Storage Tank Program OIR <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www . sjgov. org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.