Laserfiche WebLink
SA-01-77 <br /> Page 2 of 2 <br /> C. Construct a water well under permit and inspection of the Environmental Health Division <br /> prior to occupancy. Should the number of non-resident individuals exceed 24 for at least <br /> 60 days per year, or the number of service connections exceed four, a yearly permit to <br /> operate a public water system will be required by the Environmental Health Division (San <br /> Joaquin County Development Title, Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to <br /> assure delivery of pure, wholesome, and potable drinking water in accordance with San <br /> Joaquin County Development Title, Sections 9-1120.2 and—91115.9 and C.C.R., Title <br /> 22, and Health and Safety Code, Section 116525 through 116570. <br /> NOTE: Environmental Health Division cannot support using the existing irrigation well for <br /> domestic purposes. <br /> D. State on revised site plans the maximum number of employees and customers the sewage <br /> disposal system is being designed for. In addition, show on revised plans that the leach <br /> field area will be barricaded so it cannot be driven over, parked on, or used as a storage <br /> area. This leach field area must be used for that specific purpose only, and it cannot <br /> contain any underground utility lines (San Joaquin County Development Title, Section 9- <br /> 1110.4(c)(5)) <br />