Laserfiche WebLink
PA-03-612 (SA) <br /> Page 2 of 2 <br /> C. Construct water well under permit and inspection of the Environmental Health Department <br /> prior to occupancy. Should the number of non-resident individuals exceed 24 for at least 60 <br /> days per year, or the number of service connections exceed four, a yearly permit to operate a <br /> public water system will be required by the Environmental Health Department (San Joaquin <br /> County Development Title, Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial,managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title 22, and Health <br /> and Safety Code, Section 116525 through 116570. <br /> NOTE: The Environmental Health Department cannot support the long-term use of the <br /> agricultural well for domestic purposes. Contact Adrienne Ellsaesser, Lead Senior <br /> R.E.H.S. at (209) 468-0343 in order to obtain a public water system permit prior to final <br /> occupancy approval. <br /> D. Construction of individual sewage-disposal-systems) under permit and inspection by the <br /> Environmental Health Department is required at the time of development based on the Soil <br /> Suitability Study findings (San Joaquin County Development Title, Section 9-1110.3 & 9- <br /> 1110.4). <br />