My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1229
>
2300 - Underground Storage Tank Program
>
PR0527041
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 8:55:57 AM
Creation date
5/11/2022 10:41:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0527041
PE
2351
FACILITY_ID
FA0018327
FACILITY_NAME
MANTECA GAS & FOOD*
STREET_NUMBER
1229
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
20809015
CURRENT_STATUS
01
SITE_LOCATION
1229 E LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Address Chevron, 1229 E. Louise, Manteca CA 95336 Record ID PR0527041 <br /> Date 8/16/2022 Program: UST <br /> PHOTO 4: <br /> Incorrect overfill prevention inspection date listed in all the reports. <br /> Underground StoraCKTank <br /> Designated UST Operator visual Inspection Report <br /> st <br /> 10. TESTING AND MAINTENANCE Yes No j;;red <br /> Has monitoring system certification been completed within the past ® ® <br /> 12 months? <br /> Has spill container testing been completed within the past 8/12/2112 months? <br /> Has overfill prevention equipment inspection been completed within © ❑ Q 8/jy21 <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past [] ® ® VPH <br /> 36 months? <br /> Has tank tightness testing been completed within required 0 <br /> timeframes? <br /> Has line tightness testing been completed within the required <br /> timeframes? <br /> Other Test/Maintenance: [0 FrI <br /> Other Test/Maintenance: <br /> Other Test/Maintenance: TU EJ FrI <br /> 11. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility Q ❑ <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> Tank and line tightness test is not required for double wall tank and line <br /> SB989 test is not required due to VPH <br /> All answers marked"Ido"must be described by the designated UST operator in Section 3. <br /> Page 4 of 4 <br /> Gabriela Garcia-Mejia, EHS Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.