Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> B. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 Diesel <br /> Are both vent and tank riser piping F1 Yes l Yes F1 Yes ® Yes <br /> secondarily contained? El No r] No [I No Ej No <br /> OPE Model 708-690 708-690 708-690 <br /> What is the OPE response when F1 Shut off l Shut off ® Shut off M Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) F1 Restricts FIRestricts ® Restricts ® Restricts <br /> Flow Flow Flow Flow <br /> ® Audible FM Audible Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> IM Visual El Visual Visual ® Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ® Yes* ® Yes* ® Yes* ® Yes* <br /> that may interfere with the OPE operation? ®✓ No F] No F1 No ® No <br /> At what level in the tank is the OPE set to <br /> 85'375 85.375 85.375 <br /> activate? Inches from bottom of tank) <br /> What is the percent capacity of the tank at 94 94 94 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to El Yes F Yes* M Yes* ® Yes* <br /> respond when the stored substance r] No M No rl No ® No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results Pass [ Pass Pass ® Pass <br /> Fail ® Fail ® Fail Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Inspection Completed SR0085217 <br /> * Mark here if: <br /> ® Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />