My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1229
>
2300 - Underground Storage Tank Program
>
PR0527041
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 8:55:57 AM
Creation date
5/11/2022 10:41:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0527041
PE
2351
FACILITY_ID
FA0018327
FACILITY_NAME
MANTECA GAS & FOOD*
STREET_NUMBER
1229
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
20809015
CURRENT_STATUS
01
SITE_LOCATION
1229 E LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it <br /> 4)_ 'C�P ,ji�1 1 �'iflt t i \roti ii ; f <br /> j . � _ <br /> _ .> <br /> ;.; <br /> e ; i-- <br /> 4 i P <br /> It <br /> 4 t4 oil, <br /> DEFENDER SERIES " OVERFILL <br /> . Iivi cs { f s .. <br /> IlIrllf� PREVEN 'TION VALVE <br /> �� . : <br /> # �� } The Defender Series° overfill prevention valve (OPV) Is a self contained two-stage positive <br /> shut-off valve that prevents the overfill of an underground storage tank (UST) during a <br /> ' gravityded product delivery. The Defender Series° OPV employs a revolutionary magnetically- <br /> ` coupled actuator system to provide positive shutoff. This unique method of shutoff eliminates <br /> 4any penetrations in the valve, making it both vapor and leak tight . The Defender Series" OPV <br /> Alf <br /> provides safe, rapid, and reliable fuel drops for the broadest range of fuel applications and <br /> environmental conditions . Simple to Install, service and test remotely, the Defender Series" <br /> OPV Is the industry's most versatile overfill prevention valve , <br /> 1 <br /> q.. <br /> POP WIT <br /> i a <br /> • Magnetic coupler actuates the interior primary flapper Approvals/Cortiflcations <br /> assembly and secondary shut-off valve when the float rises . ULc listed <br /> outside of the valve, eliminating valve body penetrations and <br /> any potential product or vapor leak points. • ATEX approved <br /> • After cutting to length in the field, the upper drop tube is • CARB certified <br /> roli•crimped onto a top adapter outfitted with two 0•rings and Dimensions <br /> then threaded onto the top of the valve body, eliminating the <br /> need for drilling, rivets, epoxy, and flaring tools, _. a.vr <br /> . Bottom drop tube is cut in the field and threaded onto the (ioi nm,) <br /> NIS <br /> bottom of the valve ensuring straight installation. <br /> e The roil•crimp/thread method of installing drop tubes (44.5mm) i <br /> ensures proper alignment of the drop tubes with the rest , <br /> the' 0PV assembly, making installation and removal of ?;:: Y'` e sLevel ; <br /> revel <br /> :'the entire assembly smooth, % t <br /> i ;R:Dameged drop tubes can bo easily replaced instead of ` <br /> T P '. n <br /> : :. having to purchase an entire new assembly. T <br /> • : Fully compatible with gas , gas/alcohol blends , diesel <br /> and biodiesel . # <br /> .' <br /> F Vit:: <br /> Compatible with industry standard 4 ' drop tubes allowing * 17.4U r is.ao^ <br /> Ye (442 mm1 (467 ril i <br /> trofit into existing installations . - -;, i <br /> � ;ThIbld itire OPV assembly remains within the 4' inner R=te + ; . ` <br /> diameter of the riser preventing Interference with other ` � :` <br /> Tank components and also allowingremoval even while the Yom_ r <br /> tank is full , <br /> • Actuates in both low and high flow applications and � �+ l S�_ <br /> functions within a broad range of flow rates from 26 gpm ` �9 <br /> to 370 gpm (95 ipm to 1 ,400 Ipm) • <br /> • The remote testing tool allows for remote testing of the } <br /> primary functionality without having to remove the OPV <br /> from the riser. <br /> i <br /> Franklin Fueling 8vetanol <br /> i <br /> I <br /> k <br />
The URL can be used to link to this page
Your browser does not support the video tag.