Laserfiche WebLink
(E) Commercial Building68'-7"26'320'-7"144'-8"284'-2"74'-8"16'-6"30'-3"28'-4"41'-10"450 Commerce Ct11'-9"(E) Commercial BuildingSHEET NAMEPV-1.0Project No.:-_% PROJECT STATUS__/__/____LDA Partners, LLPDesigners & Architects222 Central CourtStockton, CA 95204209.943.0405www.ldapartners.comClient:Project:Architect:DESIGNERS & ARCHITECTS105.6 kW DC System (STC)(330) SunPower SPR-320E-WHT-D(165) SolarEdge P800p OptimizersSolarEdge_Technologies SE100kUS (480V)450 Commerce CtManteca, CA 95336APN #22125013Machado Sports Complex-THE FUTURE OF ENERGY-RENEWABLE TECHNOLOGIES INCORPORATEDRenewable Technologies, Inc.801 S. Lincoln St.Stockton, CA 95206Toll Free: (800)550-7652 Fax: (209)451-1057SolarStarTMAPPROVAL STAMP BLOCKELECTRICAL ENGINEERING APPROVAL:CIVIL ENGINEERING APPROVAL:OPERATIONAL APPROVAL:DRAWN BY:Thomas J. Owens, P.E.Richard Campbell, P.E.CNG Solar Engineering, INCDate (02-01-2021)DATE (02-01-2021)DATE (02-01-2021)DATE (02-01-2021)1" = 150'NOCCUPANCY GROUP: A-3TYPE OF CONSTRUCTION: TYPE V-BAUTHORITY HAVING JURISDICTION: MANTECAASSESSORS PARCEL NUMBER: #22125013NUMBER OF STORIES: 1-StoryROOF PITCH: 8°Conduit On RoofConduit In AtticFence LineBlock WallProperty LinesRoof Access PointConduit In Trench15Plot PlanScale: 2AHJ NotesScale: NTS1Sheet Index & Site InformationScale: NTS2019 CA ELECTRICAL CODE2019 CA BUILDING STANDARDS CODE2019 CA FIRE CODE6Interconnection NotesScale: NTSCODE BOOK:BREAKER SIZES:WIRE AMPACITY TABLE:MAX SYSTEM VOLTAGE CORRECTION:NUMBER OF CONDUCTORS CORRECTION:AMBIENT TEMPERATURE CORRECTION:AMBIENT TEMPERATURE ADJUSTMENT:DC GROUNDING ELECTRODE CONDUCTOR:AC GROUNDING ELECTRODE CONDUCTOR:RACK GROUNDING ELECTRODE CONDUCTOR:MAXIMUM OCPD (120% RULE):2019 CECCEC 240.6CEC 310.16CEC 690.7CEC 310.15(B)(3)(A)CEC 310.15(B)(2)(A)CEC 310.15(B)(2)(C)UNGROUNDED DC SYSTEMCEC 250.66CEC 690.47(D)CEC 690.644Electrical Code ReferencesScale: NTS3Applicable CodesScale: NTS5Equipment LocationScale: NTS12Vicinity MapScale: NTS13Aerial MapScale: NTS1.ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS AREBASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING.2.CONDUCTORS SIZED ACCORDING TO CEC 690.8, CEC 690.7.3.DC WIRING LIMITED TO MODULE FOOTPRINT. MICRO INVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECUREDUNDER THE ARRAY WITH SUITABLE WIRING CLIPS.4.AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHERCONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE*, OR OTHER CONVENTION NEUTRAL- WHITE ORGREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE CEC 110.15.1.LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH CEC 690.64(B).2.THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING CEC705.12(D)(2)(3).3.WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFFED BREAKERS MUST BELOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD CEC 705.12(D)(2)(3).4.AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVER CURRENT DEVICES SHALL NOT EXCEEDAMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVER CURRENT DEVICE MAY BE EXCLUDED ACCORDING TO CEC705.12(D)(2)(3)(C) .5.FEEDER TAP INTER CONNECTION (LOAD SIDE) ACCORDING TO CEC 705.12(D)(2)(1) .6.SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO CEC 705.12(A) WITH SERVICE ENTRANCE CONDUCTORS INACCORDANCE WITH CEC 230.42 BACK FEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROMADDITIONAL FASTENING CEC 705.12(D)(5).1.GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THEELEMENTS SHALL BE RATED FOR SUCH USE.2.PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO CEC 690.43 AND MINIMUM CEC TABLE 250.122 METAL PARTS OFMODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH CEC 250.134 AND250.136(A).3.EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO CEC 690.45 AND MICRO INVERTERMANUFACTURER'S INSTRUCTIONS.4.EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATIONAND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIEDGROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS.5.THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOTINTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE.6.GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG ORLARGER CEC 250.1197.THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH CEC 690.47 AND 250.50 THROUGH 250.106. IF EXISTING SYSTEM ISINACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO CEC 250, CEC 690.47 ANDAHJ.8.GROUND-FAULT DETECTION SHALL COMPLY WITH CEC 650.5 IN GENERAL AND CEC 690.5(A)(1) SPECIFICALLY.1.DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAININGENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS).2.DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH3.RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDINGWITHIN 10 SECONDS. CONTROLLED CONDUCTORS ≤30V AND ≤240VA [CEC 690.12]. LOCATION OF LABEL ACCORDING TOAHJ.4.ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO CEC 690.8, CEC 690.9 AND 240.5.MICRO INVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH CEC110.3(B).6.IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO CEC 690.11 AND UL1699B.1.MODULES ARE LISTED UNDER UL 1703 AND CONFORM TO THE STANDARDS.2.INVERTERS ARE LISTED UNDER UL 1741 AND CONFORM TO THE STANDARDS.3.DRAWINGS ARE DIAGRAMMATIC, INDICATING GENERAL ARRANGEMENT OF THE PV SYSTEM AND THE ACTUAL SITECONDITION MIGHT VARY.4.WORKING CLEARANCES AROUND THE NEW PV ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH CEC110.26.5.ALL GROUND WIRING CONNECTED TO THE MAIN SERVICE GROUNDING IN MAIN SERVICE PANEL/ SERVICE EQUIPMENT.6.ALL CONDUCTORS SHALL BE 600V, 90°C STANDARD COPPER UNLESS OTHERWISE NOTED.7.WHEN REQUIRED, A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS.8.THE SYSTEM WILL NOT BE INTERCONNECTED BY THE CONTRACTOR UNTIL APPROVAL FROM THE LOCAL JURISDICTIONAND/OR THE UTILITY.9.ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVEROPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION WHERE THEACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREES, WIRES OR SIGNS.10.PV ARRAY COMBINER/JUNCTION BOX PROVIDES TRANSITION FROM ARRAY WIRING TO CONDUIT WIRING1.ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY CEC 110.26.2.WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE ASSPECIFIED BY CEC 690.31(A),(C) AND CEC TABLES 310.15(B)(2)(A) AND 310.15 (B)(3)(C).3.JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO CEC 690.34.4.ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICINGDISCONNECT.5.ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES.6.ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE7General NotesScale: NTS9Grounding NotesScale: NTS11Disconnection & OCPD NotesScale: NTS10Wiring & Conduit NotesScale: NTS1.SOLAR ENERGY EQUIPMENT AND APPLIANCES SHALL CONFORM TO THE REQUIREMENTS OF CHAPTER 14 OF THE 2012 IBC,SPECIFICALLY 1401.1, AND SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATIONINSTRUCTIONS.2.PER 2012 IBC 1402.4.1, WHEN MOUNTED ON OR ABOVE THE ROOF COVERING, THE COLLECTOR ARRAY AND SUPPORTINGCONSTRUCTION SHALL BE CONSTRUCTED ON NONCOMBUSTIBLE MATERIALS OR FIRE-RETARDANT-TREATED WOOD TO THEEXTENT REQUIRED FOR THE TYPE OF ROOF CONSTRUCTION OF THE BUILDING TO WHICH THE COLLECTORS AREACCESSORY.3.ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTINGLABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL SAFETY HEALTH ADMINISTRATION.4.ALL UNDERGROUND CONDUITS SHALL BE SEALED. SEALANTS MUST BE LISTED FOR SUCH USE.SITESTREET(N) 200A Utility AC Disconnect #1(E) 1200A MSP w/(E) 1200A Main Breaker14PV LAYOUTScale: 1" = 30' SITE PLAN, ARRAY PLAN,AND PROJECT NOTES(N) (330) SunPower SPR-320E-WHT-D(N) (165) SolarEdge P800p OptimizersPlot Plan & Photovoltaic LayoutInverter String MapFire Labels & Equipment Elevation3 Line Diagram & 1 Line DiagramManufacture Spec. SheetsPV-1.0PV-2.0PV-3.0PV-4.0Attached(N) SolarEdge_Technologies SE100kUS (480V)Inside Electrical Room(N) JUNCTION BOXLDA Partners, Inc.Designers & Architects222 Central CourtStockton, CA 95204209.943.0405www.ldapartners.comArchitect:PERMIT SUBMITTAL #205/05/20215/18/2021, 8:58:12 AM21-0396Roseville Submittals6/8/2021, 1:58:25 PM21-0396LUMEN ARCEO