My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COMMERCE
>
450
>
1600 - Food Program
>
PR0547667
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 11:24:52 AM
Creation date
5/12/2022 4:32:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0547667
PE
1620
FACILITY_ID
FA0027137
FACILITY_NAME
COURTSIDE SPORTS MANTECA
STREET_NUMBER
450
STREET_NAME
COMMERCE
STREET_TYPE
CT
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
450 COMMERCE CT
P_LOCATION
04
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UtilityMeterL1L2NL3(E) 1200AMain OCPDUTILITYTRANSFORMERL1L2NGL3(E) OCPD100A, 3P(E) OCPD400A, 3P(E) OCPD200A, 3P(E) OCPD200A, 3P(E) OCPD200A, 3P(N) PV OCPD150A, 3PNGAC DISCO. 1AC.1 <br />PV RACKING <br />EQUIPMENT <br />GGGG+-+-GG+-GG+-2:1 Optimizer Typical String Wiring - PARALLEL+-+121718AC.1 <br />1200A Rated MSPDC Disco.UL ListedGL1L2NGL3+-INVERTER - SOLAREDGE MODEL SE100k USPV RACKINGEQUIPMENTG GG+-+-+-PV RACKINGEQUIPMENTG GG+-+-SunPower SPR-320NE-WHT-D Modules w/SolarEdge P800p Power OptimizersUnit 1String 1: 42 MODULES w/ 21 OPTIMIZERSString 2: 42 MODULES w/ 21 OPTIMIZERSString 3: 42 MODULES w/ 21 OPTIMIZERS+-PV RACKINGEQUIPMENTG GG+-SunPower SPR-320NE-WHT-D Modules w/SolarEdge P800p Power OptimizersUnit 2String 1: 42 MODULES w/ 21 OPTIMIZERSString 2: 42 MODULES w/ 21 OPTIMIZERSString 3: 40 MODULES w/ 20 OPTIMIZERSSunPower SPR-320NE-WHT-D Modules w/SolarEdge P800p Power OptimizersUnit 3String 1: 40 MODULES w/ 20 OPTIMIZERSString 2: 40 MODULES w/ 20 OPTIMIZERSUNIT 1UNIT 2UNIT 3DC.1 <br />SHEET NAMEPV-4.0Project No.:-_% PROJECT STATUS__/__/____LDA Partners, LLPDesigners & Architects222 Central CourtStockton, CA 95204209.943.0405www.ldapartners.comClient:Project:Architect:DESIGNERS & ARCHITECTS105.6 kW DC System (STC)(330) SunPower SPR-320E-WHT-D(165) SolarEdge P800p OptimizersSolarEdge_Technologies SE100kUS (480V)450 Commerce CtManteca, CA 95336APN #22125013Machado Sports Complex-THE FUTURE OF ENERGY-RENEWABLE TECHNOLOGIES INCORPORATEDRenewable Technologies, Inc.801 S. Lincoln St.Stockton, CA 95206Toll Free: (800)550-7652 Fax: (209)451-1057SolarStarTMAPPROVAL STAMP BLOCKELECTRICAL ENGINEERING APPROVAL:CIVIL ENGINEERING APPROVAL:OPERATIONAL APPROVAL:DRAWN BY:Thomas J. Owens, P.E.Richard Campbell, P.E.CNG Solar Engineering, INCDate (02-01-2021)DATE (02-01-2021)DATE (02-01-2021)DATE (02-01-2021)1Equipment InfoScale: NTS2SLDSCALE: N/A3WIRE CALLOUTSSCALE: N/APV Module 1(330) SunPowerSPR-320E-WHT-DPower at STC: 320WPower at PTC: 294.8WV-oc: 64.6V V-mp: 54.7VI-sc: 6.24AI-mp:5.86AV-oc Temp Coefficient: -270mV/°COutput (I-sc x 1.25 x 1.25): 9.8AAC Disconnect #1200A Utility AC Disconnect #1,3 Pole, Knife-Blade Type, 600V,Lockable, Visible, Rated NEMA3RMain Service Panel 1Existing 1200A MSP, Top-Fed3Ø, 4W, 277/480VUtility: Pacific Gas & ElectricInterconnection: PV BreakerMain Breaker De-Rated:NoPER CEC 690.64Main Panel Interconnection InformationBus Bar 1 Rating:Main Breaker 1 Rating:PV Back Feed (Actual Load):PV OCPD:Interconnection Calculation: 120% Rule1200A1200A150A150A(150A + 1200A) = 1350A (<=) 1440A4Grounding PathScale: NTSACDisco.1200A MainService Panel277/480NG(E) GROUNDINGELECTRODE#10 Bare CopperGround (At Array)Equipment On RoofEquipment At Main PanelEXISTING NEUTRALTO GROUND BOND(N) (330) SunPower SPR-320E-WHT-D(N) (165) SolarEdge P800p OptimizersGGPVInverter#10 Bare Copper GroundAmbient Temperature InformationExtreme Min Temp:-7°CAmbient Temp:39°CAmbient Temp. Adjustments0" to 7/8" Above Roof:72°C+7/8" Above Roof:61°CVoltage Drop InformationDC Voltage Drop:0.05%AC Voltage Drop:1.66%Total System Voltage Drop:2.05%SINGLE LINE DIAGRAMAND CALCULATIONSMaterialCUCU909031Wire °CPHASEParallelPV Optimizer 1(165)SolarEdge P800pMax I-sc Input: 14AMax V-oc Input: 83VMax Power Per String: 15300WInverter 1 (13440W/850V) = 15.8A(16) #10 AWG PV Wire(3) #1\0 AWG THWN-2(1) #1\0 AWG THWN-2(1) #10 AWG Bare Copper(1) #6 AWG THWN-2Not Applicable1-1/2" EMT Conduit1/2" To 3-1/2""N/A"Under ArrayExterior Wall0.650.911118A120A26A154.7A10 Ft.5 Ft.850V480V0.05%0.03%38.9%DC.1AC.1ConductorQty. Size & TypeWire De-Rate Calculation22.5A150A40A170A25A150AXX=XX=XX=NeutralQty. Size & TypeRacewaySize & TypeRacewayHeight AboveRoofRacewayLocationAmbientTemp# ofCond.OutputCurrentFinalAmpacityDist.(Ft)VoltageVoltageDrop %ConduitFill %GroundQty., Size & Type125% ofOutputCurrentWireRatingMin.OCPDWireTagInverter 1SolarEdge_Technologies SE100kUS (480V)Max Output Current: 120ASafety Rating: (120A x 1.25) = 150AMinimum OCPD: 150AMax Number of Strings: 9Number of MPPT's: 1Maximum Input Voltage: 1000VTransformerless (Y/N): YesOperating Current:15.8AOperating Voltage:850VMaximum System Voltage:1000VShort Circuit Current:144A#6 THWN-2#6 THWN-2LDA Partners, Inc.Designers & Architects222 Central CourtStockton, CA 95204209.943.0405www.ldapartners.comArchitect:PERMIT SUBMITTAL #205/05/20215/18/2021, 8:35:15 AM21-0396Roseville Submittals6/8/2021, 1:58:25 PM21-0396LUMEN ARCEO
The URL can be used to link to this page
Your browser does not support the video tag.