Laserfiche WebLink
FALIOFCSeptember 2021SS T A TEERIILCWCENH OC28388AIRNL EWOITARCHEDAILLIMECT Checked By:Drawn By:Project No.:LDA Partners, Inc.Designers & Architects222 Central CourtStockton, CA 95204209.943.0405www.ldapartners.comClient:Project:Architect:450 COMMERCE COURT,MANTECA, CA. 953366/3/2021 5:07:21 PMROOM FINISH SCHEDULEA9.02AuthorChecker727-01-18PERMIT SUBMITTAL #206/02/2021MACHADO SPORTS PARK1020 MARSH CREEKEBMA INVESTMENTSMANTECA, CA 95336FINISH MATERIALS SCHEDULEFINISHESDESIGNATIONMATERIALMFR/PRODUCTSTYLE/COLORCOMMENTSCEILINGCEILING CLG-1 SUSPENDED ACOUSTICAL CEILING ARMSTRONG 2X4 OPTIMACEILING CLG-2 GYPSUM BOARD TYPE 'X' BY CONTRACTOR TEXTURE & PAINTFLOORFLOOR CT-1 CERAMIC TILE DALTILEFLOOR LVT-1 LUXURY VINYL TILE ARMSTRONGFLOOR PT-1 VINYL COMPOSITION TILE ARMSTRONGFLOOR SC-1 SEALED CONCRETE BY CONTRACTORFLOOR SF-1 SPORTS FLOORINGWALLWALL CT-1 CERAMIC TILE DALTILEWALL FRP-1 FIBER REINFORCED PANEL KOROSEALWALL P-1 GYPSUM BOARD / PAINTED BENJAMIN MOOREWALL P-2 GYPSUM BOARD / PAINTED BENJAMIN MOOREWALL P-3 GYPSUM BOARD / PAINTEDWALL BASEWALL BASE CBT-1 COVE BASE CERAMIC TILE DALTILEWALL BASE ECB-1 EPOXY RESINOUS BASE DUR-A-FLEX / MARCO CHIP BLENDWALL BASE MB-1 METAL BASE SCHLUTER DILEX-AHK-PHK ATGB BRISH NICKEL ANODIZED ALUMINUM AT RESTROOMS - TYP.WALL BASE RB-1 RUBBER BASE BURKEROOM FINISH SCHEDULENO.ROOM NAMEFINISHESCEILINGHEIGHTCOMMENTSFLOORBASEWALLSCEILINGNORTHEASTSOUTHWESTA101 LOBBY LVT-1 RB-1 P-1 P-1 P-1 P-1 - VARIES OPEN TO ROOF STRUCTURE ABOVEA102 OFFICE 2 LVT-1 RB-1 P-1 P-1 P-1 P-1 CLG-1 10'-0"A103 OFFICE 1 LVT-1 RB-1 P-1 P-1 P-1 P-1 CLG-1 10'-0"A104 SNACKS PT-1 CT-1 FRP-1/P-1 FRP-1/P-1 FRP-1/P-1 FRP-1/P-1 CLG-1 10'-0"A105 EVENT ROOM LVT-1 RB-1 P-1 P-1 P-1 P-1 CLG-1 10'-0"A107 MEN'S PT-1 CT-1 CT-1/P-3 CT-1/P-3 CT-1/P-3 CT-1/P-3 CLG-2 10'-0"A108 WOMEN'S PT-1 CT-1 CT-1/P-3 CT-1/P-3 CT-1/P-3 CT-1/P-3CLG-2 10'-0"A109 STORAGE SC-1 RB-1 P-2 P-2 P-2 P-2 CLG-2 - OPEN TO ROOF STRUCTURE ABOVEA110 ELECT. RM. SC-1 P-2 P-2 P-2 P-2 CLG-2 10'-0"A111 GYMNASIUM SF-1- VARIES OPEN TO ROOF METAL BUILDING STRUCTURE ABOVEA112 JNTR. SC-1 RB-1 FRP-1/P-2 FRP-1/P-2 FRP-1/P-2 FRP-1/P-2 CLG-2 9'-0"A113 STRG. LVT-1 RB-1 P-1 P-1 P-1 P-1 CLG-2 9'-0"A114 WOMEN'S R.R. PT-1 CT-1/P-3 CT-1/P-3 CT-1/P-3 CT-1/P-3 CLG-2 9'-0"A115 FIRE RISER RM. SC-1 P-2 P-2 P-2 P-2 CLG-2 10'-0"A116 I.T. RM. LVT-1 RB-1 P-1 P-1 P-1 P-1 CLG-2 9'-0"A117 RoomA118 RoomA119 RoomA120 RoomA121 RoomA122 GYMNASIUM SF-1- VARIES OPEN TO ROOF METAL BUILDING STRUCTURE ABOVEA123 RoomA125 Room1. ALL GYPSUM BOARD WALLS AND CEILINGS TO BE LEVEL 4 FINISH - UNLESS OTHERWISE NOTED.2. ALL GYPSUM BOARD WALLS AND CEILINGS TO BE PAINTED P-1 - UNLESS OTHERWISE NOTED.3. ALL RESTROOMS TO HAVE TILE PATTERN 1 AT WALLS UNLESS OTHERWISE NOTED. SEE TILE PATTERN ELEVATIONS, THIS SHEET.4. REFER TO ROOM FINISHES PLAN FOR FLOORING PATTERNS, WHERE OCCURS.1. ALL CASEWORK TO FOLLOW AWS GUIDELINES.2. ALL LAMINATE PATTERN TO RUN HORIZONTALLYUNLESS OTHERWISE NOTED.3. ALL SOLID SURFACING TO HAVE SQUARE EDGING.4. ALL OPEN CASEWORK TO HAVE MATCHING LAMINATE AS EXTERIOR FACING.5. ALL INTERIOR CASEWORK MELAMINE TO BE WHITE.6. CONTRACTOR TO MEET OR EXCEED NAAWS 3.0 CUSTOM OR PREMIUM GRADE STANDARDS.CASEWORK NOTES: INTERIOR NOTES: No. Description Date By5/18/2021, 8:35:15 AM21-0396Roseville Submittals6/8/2021, 1:58:25 PM21-0396LUMEN ARCEO