NUMBER MODEL SIZE TYPE GPM PSI PSI @ POC PRECIP
<br />1 Hunter ICZ-101-25-LF 1"Area for Drip Emitters 7.98 32.59 35.82 36.38 in/h
<br />2 Hunter ICZ-101-25-LF 1"Area for Drip Emitters 5.33 30.53 35.07 0.81 in/h
<br />3 Hunter ICZ-101-25-LF 1"Area for Drip Emitters 2.04 30.36 32.84 0.21 in/h
<br />4 Hunter ICZ-101-25-LF 1"Area for Drip Emitters 7.14 31.61 37.12 0.54 in/h
<br />5 Hunter ICZ-101-25-LF 1"Area for Drip Emitters 2.02 29.79 32.03 0.64 in/h
<br />6 Hunter ICZ-101-25-LF 1"Area for Drip Emitters 6.16 30.78 34.48 0.61 in/h
<br />7 Hunter ICZ-101-25-LF 1"Area for Drip Emitters 2.04 29.79 32.16 0.08 in/h
<br />8 Hunter ICZ-101-25-LF 1"Area for Drip Emitters 3.59 30.33 33.35 0.86 in/h
<br />9 Hunter ICV-G 1"Bubbler 17.00 26.65 31.99 0.88 in/h
<br />VALVE SCHEDULE
<br />L7.1
<br />WELO Notes
<br />and
<br />Calculations
<br />Checked By:
<br />Drawn By:
<br />Project No.:
<br />LDA Partners, Inc.
<br />Designers & Architects
<br />222 Central Court
<br />Stockton, CA 95204
<br />209.943.0405
<br />www.ldapartners.com
<br />Client:
<br />Architect:
<br />Project:
<br />450 COMMERCE COURT
<br />MANTECA, CA 95336
<br />11/13/2020 3:11:00 PMRSH
<br />RSH
<br />18-077 (SHLA 19-008)
<br />PERMIT SUBMITTAL
<br />06.02.2021
<br />MACHADO SPORTS COMPLEX
<br />1020 MARSH CREEK
<br />EBMA INVESTMENTS
<br />MANTECA, CA, 95336
<br />No.Description Date By
<br />S a m H a r n e d
<br />L a n d s c a p e
<br />A r c h i t e c t u r e
<br />P O B o x 2 2 7 5
<br />O a k d a l e , C A 9 5 3 6 1
<br />w w w .h a r n e d l a .c o m
<br />2 0 9 -3 8 0 -7 3 7 6
<br />07 June 2021
<br />LANDSCAPE WELO ORDINANCE
<br />This project has been designed to comply with the criteria of the Water Efficient Landscape
<br />Ordinance - California Code of Regulations Title 23, Division 2, Chapter 2.7 § 490 - 494 ("WELO" or
<br />the "Ordinance") as adopted by the jurisdictional agency ("Agency") for this project. The following
<br />information provides data required by the Ordinance and specifically fulfills the requirements of the
<br />Landscape Documentation Package as outlined in § 492.3 of the Ordinance. Upon completion of the
<br />Project, Contractor shall be responsible for certifying compliance with the Ordinance and Agency
<br />requirements. Prior to start of Work, Contractor shall review this information and the Ordinance to
<br />establish a full understanding of the measures necessary to meet requirements of the Ordinance.
<br />Contractor shall notify the Owner of anything the Contractor feels does not meet the requirements of
<br />the Ordinance or Agency requirements. Landscape work shall not commence until such concerns are
<br />corrected to the satisfaction of all parties.
<br />LANDSCAPE ARCHITECT'S STATEMENT
<br />I have complied with the criteria of the ordinance and applied them accordingly for the efficient use of
<br />water in the irrigation design plan and the landscape design plan.
<br />SOILS MANAGEMENT REPORT
<br />This project will require significant earthwork and/or construction activity. The type of soil in the
<br />proposed landscape areas cannot be sufficiently assessed until the earthwork and construction is
<br />substantially completed. Per §492.5 paragraph (a) (2) (B) of the State Ordinance, Contractor shall,
<br />upon completion of the earthwork operations, acquire soil samples representative of all landscape
<br />areas and have the samples analyzed by an approved laboratory in accordance with §492.5
<br />paragraph (a) (1) of the State Ordinance. Contractor shall submit the approved soil laboratory's
<br />recommendations for amending the soil as appropriate for the proposed planting in a timely manner
<br />to allow for modifications to the design plans and specifications as may be required. Contractor shall
<br />amend soil in accordance with the laboratory recommendations unless otherwise directed.
<br />LANDSCAPE DESIGN PLAN
<br />See Planting Plan of this set of drawings.
<br />IRRIGATION DESIGN PLAN
<br />See Irrigation Plan of this set of drawings.
<br />GRADING DESIGN PLAN
<br />See Site Grading and Drainage Plan of this set of drawings. See also grading design plans prepared
<br />by the Civil Engineer for this project.
<br />CERTIFICATE OF COMPLETION
<br />Contractor shall be responsible of preparing and submitting the Certificate of Completion required by
<br />the Water Efficient Landscape Ordinance - California Code of Regulations Title 23, Division 2,
<br />Chapter 2.7 § 490 - 494. Refer to the Landscape Documentation Package and the information below
<br />to provide guidance on preparing the certificate. The certificate shall be prepared and submitted upon
<br />Substantial Completion. Approval of the certificate and verification by the City that the landscape and
<br />irrigation has been installed in accordance with the approved landscape and irrigation plans and the
<br />Landscape Documentation Package is required prior to Final Acceptance of the project.
<br />PROJECT INFORMATION SHEET
<br />Contractor shall complete Project information sheet found in the "Certificate of Completion" per
<br />Appendix C of the Ordinance.
<br />CERTIFICATION OF INSTALLATION
<br />Contractor shall prepare the "Certification of Installation According to the Landscape Documentation
<br />Package" per Appendix C of the Ordinance.
<br />IRRIGATION SCHEDULE
<br />See the irrigation schedules provided on this page as a guide. Contractor shall prepare an irrigation
<br />schedule meeting the requirements of §492.10 of the Ordinance. Contractor shall use the irrigation
<br />schedule provided with these drawings for the initial settings and after observing operation of the
<br />system Contractor shall make all adjustments necessary to finalize recommended schedules for the
<br />plant establishment period (first 12 months) and the post-establishment period providing values
<br />appropriate to each of the 4 seasons--winter, spring, summer, and fall.
<br />MAINTENANCE SCHEDULE
<br />Contractor shall prepare a schedule of landscape and irrigation maintenance meeting the
<br />requirements of §492.11 of the Ordinance.
<br />IRRIGATION AUDIT REPORT
<br />Contractor shall retain the services of an independent, third-party, certified landscape irrigation
<br />auditor to conduct an irrigation audit, an irrigation survey, and an irrigation water use analysis in
<br />accordance with the requirements of §492.12 of the Ordinance. Contractor shall prepare an Irrigation
<br />Audit Report of the results of the audit. Should the audit identify conditions that are not in compliance
<br />with the Ordinance. Contractor shall make corrections at no additional cost.
<br />SOIL MANAGEMENT REPORT
<br />Per §492.5 of the Ordinance, Contractor shall submit the soil analysis report on which the soil
<br />amendments were based together with acceptable documentation that the soil was amended per the
<br />recommendations in the report.
<br />Reference Evapotranspiration 51.2 in/yr ETAF(req)Maximum Allowed ETAF 0.45
<br />APPENDIX B WORKSHEETHydro-zone
<br />(see desc.
<br />below)
<br />Plant Factor
<br />(PF)
<br />Irrigation
<br />Method
<br />Irrigation
<br />Efficiency
<br />(IE)
<br />ETAF
<br />(PF/IE)
<br />Landscape Area
<br />(sq. ft.)
<br />ETAF
<br />x
<br />Area
<br />Estimated Total
<br />Water Use
<br />(ETWU)
<br />Regular Landscape Areas ("RLA") - See Hydrozone Descriptions for Referenced Numbers
<br />1.00 Spray 0.75 1.33 0 sf 0.00 0 gals
<br />0.85 Spray 0.75 1.13 0 sf 0.00 0 gals
<br />0.60 Spray 0.75 0.80 0 sf 0.00 0 gals
<br />6 0.50 Drip 0.81 0.62 5,156 sf 3,182.72 101,032 gals
<br />0.30 Spray 0.75 0.40 0 sf 0.00 0 gals
<br />9 0.30 Drip 0.81 0.37 15,142 sf 5,608.15 178,025 gals
<br />0.10 Drip 0.81 0.12 0 sf 0.00 0 gals
<br />Sub-totals 20,298.00 8,790.86 279,057 gals
<br />Special Landscape Areas ("SLA") - See Hydrozone Planting Descriptions for Referenced Numbers
<br />SLA1 1.00 0 sf 0.00 0 gals
<br />SLA2 1.00 0 sf 0.00 0 gals
<br />Sub-totals 0 sf 0.00 0 gals
<br />Total Landscape Area (regular and special)20,298 sf 8,790.86
<br />ETWU Total 279,057 gals
<br />Maximum Allowed Water Allowance (MAWA)289,953 gals
<br />MAWA CALCULATIONMAXIMUM ALLOWABLE WATER CALCULATION ("MAWA")
<br />Ref. ETo Conv.
<br />ET Adjustment
<br />Factor "ETAF"
<br />Area Incl.
<br />"SLA" (sf)
<br />SLA Addt'l
<br />Water
<br />Special
<br />Landscape Area
<br />(sf)
<br />MAWA =( ETo )( 0.62 )[ ( ETAF x LA ) +( (1-ETAF)x SLA ) ]
<br />289,953 gal/yr 51.2 in/yr 0.62 0.45 20,298 sf 0.55 0 sf
<br />Data used in MAWA Formula (per 2015 WELO):
<br />Ref.
<br />Evapotransipiration
<br />(in/yr) ETo=
<br />51.2 in/yr Landscape Area including
<br />SLA 20,298 sf
<br />Conversion Factor
<br />(to gallons)0.62 Additional Water Allowance
<br />for SLA (1-ETAF)0.55
<br />Required ETAF per
<br />Ordinance for
<br />Project
<br />0.45 Special Landscape Area
<br />("SLA" in SF)0 sf
<br />ETWU CALCULATIONESTIMATED TOTAL WATER USE (ETWU) TOTAL SITE W/ SLA FACTORED IN
<br />ETWU = ( ETo )( 0.62 )(ETAF)(Area)
<br />279,057 gal/yr 51.2 in/yr 0.62 0.43 20,298 sf
<br />ETAF CALCULATIONS
<br />Regular Landscape Area (RLA)
<br />ETAF
<br />Max Allowed
<br />ETAF
<br />Total ETAF x RLA 8790.86
<br />Divided by Total RLA 20,298 sf If Average ETAF is less than Max. Allowed
<br />ETAF the Project complies with WELOAverage ETAF (RLA)0.43 0.45
<br />Sitewide ETAF
<br />Total ETAF x Area (RLA and
<br />SLA)8790.86
<br />Divided by Total Area (RLA and
<br />SLA)20,298 sf
<br />Sitewide ETAF (RLA and SLA)0.43
<br />The schedules below are based on calculating runtime and frequency of irrigation cycles to meet the average evapotranspiration of noted seasons factoring in the rate of water delivery, plant factors,
<br />and other variables. Actual runtimes and frequency of cycles required to sustain the landscape at the desired aesthetic appearance may differ and must be adjusted to due to field observations of
<br />microclimates, slope conditions, solar exposure, and other variables. Contractor shall observe the health of the plantings during the establishment period and make adjustments necessary from
<br />observed conditions and plant health.
<br />After the establishment period it is incumbent upon the Owners and Owner's maintenance entity to observe plant health and desired aesthetic appearance and make adjustments to the irrigation
<br />schedules as may be required to satisfy their desired aesthetic appearance as well as limit water use to less than the MAWA.
<br />PRELIMINARY IRRIGATION SCHEDULES
<br />PRELIMINARY IRRIGATION SCHEDULE - PLANT ESTABLISHMENT PERIOD
<br />Winter
<br />(Nov, Dec, Jan, Feb)
<br />Spring
<br />(Mar, Apr, May)
<br />Summer
<br />(Jun, Jul, Aug, Sep)
<br />Autumn
<br />(Oct.)
<br />Hydro-z
<br />one Description Zone
<br />Runtime
<br />Cycles per
<br />Month Runtime
<br />Cycles per
<br />Month Runtime
<br />Cycles per
<br />Month Runtime
<br />Cycles per
<br />Month
<br />1 High water use turf with gear rotor
<br />irrigation 20 min.4 40 min.30 75 min.30 40 min.30
<br />2 High water use turf with rotary spray
<br />irrigation 10 min.4 16 min.15 16 min.30 16 min.15
<br />3 High water use plantings with drip
<br />irrigation 20 min.8 45 min.15 60 min.30 45 min.15
<br />4 Moderate water use plantings with
<br />subsurface irrigation 30 min.5 30 min.15 45 min.15 30 min.15
<br />5 Moderate water use plantings with rotary
<br />spray irrigation 10 min.4 15 min.15 20 min.15 15 min.15
<br />6 Moderate water use plantings with drip
<br />irrigation 1-2 20 min.4 35 min.15 40 min.30 35 min.15
<br />7 Low water use plantings with subsurface
<br />irrigation 15 min.4 20 min 15 30 min.10 20 min 15
<br />8 Low water use plantings with rotary
<br />spray irrigation 15 min.2 10 min.15 15 min.15 10 min.15
<br />9 Low water use plantings with drip
<br />irrigation 3-8 10 min.4 30 min.15 25 min.30 30 min.15
<br />10 Bio-filtration basin 20 min.5 45 min.15 65 min.15 40 min.15
<br />11 No irrigation / inert landscape area 20 min.5 40 min.15 50 min.15 45 min.15
<br />12 Trees with root watering system 9 0 min.0 30 min.5 45 5 30 min.5
<br />SLA 1
<br />SLA 2
<br />HYDROZONE DESCRIPTIONS
<br />Hydrozone
<br />number Description Irrigation zones on
<br />plan
<br />1 High water use turf with gear rotor irrigation
<br />2 High water use turf with rotary spray irrigation
<br />3 High water use plantings with drip irrigation
<br />4 Moderate water use plantings with subsurface irrigation
<br />5 Moderate water use plantings with rotary spray irrigation
<br />6 Moderate water use plantings with drip irrigation 1-2
<br />7 Low water use plantings with subsurface irrigation
<br />8 Low water use plantings with rotary spray irrigation
<br />9 Low water use plantings with drip irrigation 3-8
<br />10 Bio-filtration basin
<br />11 No irrigation / inert landscape area
<br />12 Trees with root watering system 9
<br />SLA 1
<br />SLA 2
<br />PRELIMINARY IRRIGATION SCHEDULE - ESTABLISHED PLANTING
<br />Winter
<br />(Nov, Dec, Jan, Feb)
<br />Spring
<br />(Mar, Apr, May)
<br />Summer
<br />(Jun, Jul, Aug, Sep)
<br />Autumn
<br />(Oct.)
<br />Hydro-z
<br />one Description Zone
<br />Runtime
<br />Cycles per
<br />Month Runtime
<br />Cycles per
<br />Month Runtime
<br />Cycles per
<br />Month Runtime
<br />Cycles per
<br />Month
<br />1 High water use turf with gear rotor
<br />irrigation 0 min.0 60 min.15 75 min.30 40 min.30
<br />2 High water use turf with rotary spray
<br />irrigation 0 min.0 15 min.15 16 min.30 15 min.15
<br />3 High water use plantings with drip
<br />irrigation 0 min.0 45 min.15 60 min.30 45 min.15
<br />4 Moderate water use plantings with
<br />subsurface irrigation 0 min.0 25 min.15 30 min.30 25 min.15
<br />5 Moderate water use plantings with rotary
<br />spray irrigation 0 min.0 15 min.10 15 min.18 15 min.10
<br />6 Moderate water use plantings with drip
<br />irrigation 1-2 0 min.0 45 min.10 60 min.15 45 min.10
<br />7 Low water use plantings with subsurface
<br />irrigation 0 min.0 20 min 15 30 min.10 20 min 15
<br />8 Low water use plantings with rotary
<br />spray irrigation 0 min.0 10 min.15 15 min.15 10 min.15
<br />9 Low water use plantings with drip
<br />irrigation 3-8 0 min.0 30 min.10 40 min.15 30 min.10
<br />10 Bio-filtration basin 0 min.0 45 min.10 65 min.10 45 min.10
<br />11 No irrigation / inert landscape area 0 min.0 40 min.10 50 min.10 40 min.10
<br />12 Trees with root watering system 9 0 min.0 30 min.5 30 min.5 30 min.5
<br />SLA 1
<br />SLA 2
<br />WATER EFFICIENT LANDSCAPE ORDINANCE WORKSHEET
<br />A regular maintenance schedule shall be set up for this project to provide healthy plants and an
<br />efficient, functional irrigation system. The following practices shall be incorporated into a regular
<br />maintenance schedule:
<br />1.Maintain irrigation system. Adjust or replace delivery system components to keep them working
<br />to meet manufacturer specifications. Repair leaks in a timely manner. Replacement products and
<br />materials shall match originally specifications, or equal..
<br />2.Review drip emitters and adjust locations as plants mature. Replace emitters as needed to
<br />adjust water delivery to each plant, as needed.
<br />3.Adjust controller as required to provide proper amount of water to each zone.
<br />4.Mow turf on a regular basis. De-thatch and aerate annually.
<br />5.Prune plantings to maintain design form (e.g.- natural, hedge) and to remove broken or dead
<br />branches. Remove suckers from tree roots on a regular basis.
<br />6.Establish a regular program of weed and pest control. Conform to any local regulations
<br />regarding use of pesticides and herbicides. Pesticides and herbicides are to be applied only when
<br />needed and by a state licensed professional.
<br />7.Re-apply mulches as needed to maintain full coverage at planting areas, retain soil moisture,
<br />and inhibit weed growth.
<br />MAINTENANCE SCHEDULE
<br />6/8/2021, 1:58:25 PM
<br />21-0396
<br />LUMEN ARCEO
|