Laserfiche WebLink
MAMA <br />M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 <br />MBMB <br />MC <br />MD <br />ME <br />MGMG <br />MHMH <br />MF <br />BB <br />BB <br />S301 <br />26 <br />S30113 <br />S301 <br />35 <br />S301 33 <br />25' - 0"18' - 0"14' - 0"18' - 0"25' - 0"100' - 0"(7) SPACES @ 25' - 0"= 170' - 0"15' - 0"25' - 0" <br />210' - 0"25' - 0"11' - 2"26' - 0"12' - 10"25' - 0"S220 <br />GT-1 <br />8 <br />S220 <br />xCS-107 <br />1 <br />xCS-108 <br />1 <br />Checked By: <br />Drawn By: <br />Project No.: <br />LDA Partners, LLP <br />222 South Central Court <br />Stockton, CA 95204 <br />209.943.0405 <br />www.ldapartners.com <br />Consultant: <br />Project: <br />Architect: <br />jh lawder, inc. <br />structural engineers <br />717 16th Street, Ste. 4, Modesto, CA 95354 <br />(209) 521-1143 Fax: (209) 521-1581 <br />Client: <br /> 5/06/21 <br />5/6/2021 9:34:33 AMPEMB ROOF FRMG PLAN <br />S222 <br />Author <br />JL <br />727-01-18 <br />PERMIT SUBMITTAL <br />5/5/21 <br />MACHADO SPORTS COMPLEX <br />450 COMMERCE COURT, MANTECA, CA <br />95336 <br />1020 MARSH CREEK <br />EBMA INVESTMENTS <br />###.###.#### <br />MANTECA, CA 95336 <br />1/8" = 1'-0"1 +30'-0" EAVE HT <br />No. Descripotion Date By <br />6/8/2021, 1:58:25 PM <br />21-0396 <br />LUMEN ARCEO