My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COMMERCE
>
450
>
1600 - Food Program
>
PR0547667
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 11:24:52 AM
Creation date
5/12/2022 4:32:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0547667
PE
1620
FACILITY_ID
FA0027137
FACILITY_NAME
COURTSIDE SPORTS MANTECA
STREET_NUMBER
450
STREET_NAME
COMMERCE
STREET_TYPE
CT
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
450 COMMERCE CT
P_LOCATION
04
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FUTURE EV CHARGERSPROVIDE 1"CO TO EVPANEL IN ELECTRICAL ROOMEV CHARGER, 208V,1PH, 40AEV-1,3EV-5,7#8#8IT ROOM, WITH PHONE BOARD4"CO26.01IRRIGATION CONTROLLER 120VL-2MID VAULTP-6L-4MONUMENT SIGN, PROVIDELOCAL WP TOGGLE DISCONNECTP-5800A 480V 3 PHASE SERVICE MSBTELECOM BOXSEE PHOTOMETRIC STUDYFOR POLE DESCRIPTIONAND DISTRIBUTIONLEDT5LEDT3LEDT3LEDT5LEDT5SLEDT5SLEDT4SIGNP-7P-11BUILDING MOUNT SIGNAGEVERIFY LOCATION, ROUTE THRU4 POLE TIME CLOCK IN ELECTRICAL ROOMTYPICAL FOR 3SIGNCONDUIT W/ CABLESPER PLAN. PROVIDEGROUND LUGS AT POLE BASE.(3)#3 REBAR HOOPSWITHIN TOP 5" OF BASE4" SQ. STEEL POLE PRIMED & PAINTED 2 COATS OF QUALITY ENAMEL IN FACTORY OF COLOR TO MATCH HEAD. TOUCH UP BY ELECTRICAL CONTRACTOR.(8)#3 REBAR W/#2 HOOPS 8" O.C.HOOPS TO BE 18" DIA.CONCRETE BASE 24" DIA. MIN.(3000 PSI CONC.)HANDHOLEBASE COVER SECURELY AFFIXEDBY TAMPERPROOF SCREWSWEEPHOLE AT BASESINGLE LUMINAIRESEE TABLE LAMP: 70W LEDVOLTAGE: 208VFINISH: BRONZEDISTRIUBTION: MEDIUM CUT-OFF TYPE III(4)3/4"DIAx18" LONG ANCHORBOLTS W/LEVELING NUTSW/8"DIA BOLT CIRCLEHARDSCAPESEE ARCH.SITE PLAN20' - 0"0' - 2"0' - 3"2' - 0"2' - 6"5' - 6"2' - 6"CURBFALIOFCSeptember 2019SS T A TEERIILCWCENH OC28388AIRNL EWOITARCHEDAILLIMECT Checked By:Drawn By:Project No.:LDA Partners, Inc.Designers & Architects222 Central CourtStockton, CA 95204209.943.0405www.ldapartners.comClient:Architect:Project:450 COMMERCE COURTMANTECA, CA 95336HHHHTTTTIIIIMMMMSSSSC.C.C.C.DDDDRRRRAAAAHHHHCCCCIIIIRRRRNo. E14303No. E14303No. E14303No. E14303Exp. 6Exp. 6Exp. 6Exp. 6----30303030----21212121EEEELLLLEEEECCCCTTTTRRRRIIIICCCCAAAALLLLRRRREEEEGGGGIIIISSSSTTTTEEEERRRREEEEDDDDPPPPRRRROOOOFFFFEEEESSSSSSSSIIIIOOOONNNNAAAALLLLEEEENNNNGGGGIIIINNNNEEEEEEEERRRREEEEOOOOFFFFCCCCAAAALLLLIIIIFFFFOOOORRRRNNNNIIIIAAAASSSSTTTTAAAATTTTHCSEngineering50 years4512 Feather River Dr #F, Stockton, CA 952194512 Feather River Dr #F, Stockton, CA 952194512 Feather River Dr #F, Stockton, CA 952194512 Feather River Dr #F, Stockton, CA 95219209209209209----478478478478----8270 | www.hcs8270 | www.hcs8270 | www.hcs8270 | www.hcs----eng.comeng.comeng.comeng.cominc.Enterprise Electric1250 S Wilson Way, Stockton, CA 95205 1250 S Wilson Way, Stockton, CA 95205 1250 S Wilson Way, Stockton, CA 95205 1250 S Wilson Way, Stockton, CA 95205 voice 209voice 209voice 209voice 209----464464464464----6627662766276627http://enterpriseelectric.yolasite.com/http://enterpriseelectric.yolasite.com/http://enterpriseelectric.yolasite.com/http://enterpriseelectric.yolasite.com/path://john/17/4BIM 360://Machado Sports/Machado Sports Electrical v21.rvtELECTRICAL SITE PLANE1.1BAChecker727-01-18PLAN CHECK5.28.21MACHADO SPORTS COMPLEX1020 MARSH CREEKEBMA INVESTMENTS###.###.####MANTECA, CA 95336ELECTRICAL KEY NOTESKey ValueKeynote Text26.01 UTILITY TRANSFORMER. ELECTRICAL CONTRACTOR SHALL PROVIDETRANSFORMER PAD, GROUNDING AND BARRIER POSTS PER UTILITYCOMPANY REQUIREMENTSSCALE: 1" = 30'-0"ELECTRICAL SITE PLAN1SCALE: 1" = 30'-0"PHOTOMETRIC STUDY2SCALE: NTSLIGHT STANDARD RAISED BASE3No. Description Date By1 PLAN CHECK 4.8.215/18/2021, 8:35:15 AM21-0396Roseville Submittals6/8/2021, 1:58:25 PM21-0396LUMEN ARCEO
The URL can be used to link to this page
Your browser does not support the video tag.