Laserfiche WebLink
Piping (cross-sectional diagram, including connections to tank and dispensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br /> Provide positive shut off of flow to the tank at no more than 95 % (Section 2635 (b)(2)(C)], or <br /> (B) V/ Vapor recovery piping designed so it cannot contain liquid phase product, pr <br /> (C) Suction piping (below grade piping operates at less than atmosphericp essure) (Section 2636 (a) (3)] <br /> _ Sloped so contents of the pipe will drain back int the storage tank if the suction is <br /> released. <br /> _ No valves or pumps installed below grade. <br /> _ Inspection method provided to demonstrate mpliance with section 2636 (a) (3). <br /> Corrodible underground piping protected against corrosio (Section 2636 (b)). <br /> (E) V Underground primary piping will meet all of the folio ng requirements <br /> _� Primary piping in contact with hazardous s stance under normal operation conditions shall be: <br /> installed inside a secondary contair%m t stem in the form of:_✓secondary pipe_Vault or <br /> _lined trench to be sloped to a toile tion sump at the low point of the piping. <br /> Primary piping and secondary containm t systems will be installed in accordance with industry <br /> code of practice and voluntary conse us standards.. <br /> _ Lined trench used as secondary con ainment <br /> _ Material compatible wit the substance stored. <br /> _ Covered and capable o supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containmen will be equipped and monitored as follows: <br /> _I/ Secondary containment wil be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> Automatic line leak de ectors will be installed on pressurized piping <br /> Manufacturer: Model: <br /> _ Annual monitoring w. l be conducted on the pressurized piping with secondary containment. <br /> _ Annual line tight ss test will not be required if the continuous monitor shuts down the pump and <br /> activates the al m system when a release is detected and when the continuous monitoring system <br /> �(/ fails or is disc nnected. <br /> civ 20 State Water Resources Control and "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 12l. V/ Plan review and operating per it fees paid. l <br /> V1I22. What is the approximate dep to ground water: <br /> (include source of informa ion - orehole Logs monitoring well data, water <br /> studies, etc.) S� \ w� a +-r - I I y <br /> s --e- -" -�c"'�- �O lrs b C� ��, i►oi V /. <br /> 23. _✓ Total number of tanks site after installation: s <br /> 24 County/City Fire Dist lct and Building Department notified. <br /> 25 ✓ In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> owner or operaes. Forurt <br /> tor to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br /> Requirements] as n further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> assessment or r iation owner activiti <br /> r Sor must acknowledge this responsibility for w <br /> orkplan submittal by signature and dat��low. <br /> FO���Y )Uner gf f it <br /> Title <br /> CONDITIONS OF APPROVAL: <br /> g <br />