Multiple tank installation will also require a 8.2 If tank must be ballasted during the backfill <br /> minimum of 12 inchas between tank measured from procedure, at no time may the liquid exceed the <br /> height of the compacted backfill surrounding the <br /> each outside edge, tank. <br /> ANCHORING 8.3 The tank shall be encompassed by the proper <br /> backfill and e-dending to a minimum of 12 inches <br /> 7.0 Certain situations require the use of properly over the top of the tank. <br /> designed anchor straps to overcome existing 8,4 Areas subject to heavy vehicular traffic shall have <br /> buoyant forces.The straps are used in conjunction a protective cover of 18 inches clean, compacted <br /> with a concrete holddown slab or deadman soil with either 6 inches of reinforced concrete or 8 <br /> anchors. inches of asphalt paving. If compacted soil is the <br /> eel cable or round only cover,it shall be a minimum of 36 inches <br /> CAUTION: Use of st <br /> bar is prohibited. deep. <br /> 8.5 Areas not subject to heavy vehicular traffic shall <br /> have a protective cover of a minimum 18 inches of <br /> �• 111E USE OF STEEL clean compacted soil covered by 4 inches of <br /> •.' r-:i CABLE AND ROUND BAF halt paving. If <br /> 6 P°Fo„1D,e 1E"$1PAP° reinforced concrete or 6 inches of asp P <br /> compacted soil is the only cover, it shall be a <br /> 4 minimum of 24 inches deep. <br /> 8.6 Finishing Instructions; A fiberglassing kit is <br /> shipped with tank and provides materials to cover <br /> unused openings and external attachments, such <br /> as lifting lugs.All finishing work will be done <br /> 7.1 A pad of inert,insulating, dielectric material must <br /> prior to backfilling. to be initiated, the <br /> be used to separate the anchor strap from the 9.0 For Glasteel 11 warran <br /> Installation Ch cklist tmy ust be properly Filled out <br /> tank. by the customer, and returned to the Modern <br /> BACKFILL Welding Co.subsidiary from which the tank was <br /> fabricated. The Installation Checklist must be <br /> 8.0 Only the following approved backfill material may returned within 30 days after date of installation.If the <br /> be used. Glesteel 11 tank has not been installed within 90 days <br /> 1. Clean washed sand. of delivery from the manufacturer,it is required that the <br /> 2.Pea Gravel• (particle size must be not less than tank be re-certified by the manufacturer,at the owner's <br /> 1/8 inch or more than 3/4 inch) expense,prior to installation. <br /> 3.Washed stone or gravel crushings - jNTENANCE <br /> (angular particle size required to be not less <br /> than 1/8 inch or more than 1/2 inch) 10.0 Maintenance of Underground Storage Tanks <br /> The primary tank should be inspected monthly for the <br /> Z presence of water.Inspections should take8�R mov <br /> Y PM t rod[ <br /> 3 lowest possible pointe inside the primary <br /> any water found. Water and sediment in fuel cancause <br /> 3 from <br /> t .. •• plugging of filters.Also,bacterial growth originating <br /> 12• the fuel,can cause filters to plug and corrosion of tanks <br /> and lines.A report by the US Department of Energy, <br /> BNL 48406,provides information on methods to test for <br /> and remove water,test for bacterial presence in fuel,tank <br /> 8.1 Special care should be used to ensure that the cleaning and fuel additives.Failure to remove water from <br /> backfill is properly installed to away support the the tank may void your warranty. <br /> p Y <br /> bottom quadrant of the tank. different SUBSIDIARIES NATIONWIDE: <br /> NOTE: Do not backfill in layers using <br /> materials. 602 688-4400 <br /> Corporate Office ( � 683_5323 <br /> grata Modern Welding Company of Owensboro,Inc (502) <br /> FWWwd Modern Welding Company of Ohio,Inc (740) 344-9425 <br /> an of Florida,Inc (407)843-1270 <br /> Modern Welding Company 676-4211 <br /> hpioalty 3 m 4 ti Modern Welding Comp any of Texas,Inc (713) <br /> f Texas,Inc (817)686-2215 <br /> Modern Welding Company o <br /> M 9 764-6577 <br /> an f Iowa, Inc (31 ) <br /> Modern Welding Come Y oInc (209)276-9363 <br /> Modern <br /> Welding Company of California, <br /> ." Modern Welding Company of Georgia,Inc (706) 722-3411 <br /> SPDCW <br /> FORM Gles2ine, 09/1998 MWCO <br />