Laserfiche WebLink
I <br /> Flexible • • • • Piping Manual environ - <br /> I <br /> 7.1 Piping Turns to insure an even layer of bedding material under the pipe. <br /> Remove all sharp rocks and debris from the trench bottom <br /> Piping trenches should be cut with s <br /> sweeping turns.Flexible piping turns ,; before bedding material is installed. <br /> Il require specific radii depending on <br /> the pipe diameter. Piping turns 8.2 Bedding & Backfill Materials <br /> should not be less than: f� � <br /> ,r rf Approved bedding and backfill materials for the GeoFlex, <br /> 75" 18" radius " ;+ GeoVent and GeoDuct flexible piping shall meet the following <br /> 1.5" -24" radius ,17, ,? specifications: <br /> 2" -24" radius <br /> 3" 48" radius <br /> 8.2.1 Pea Gravel <br /> - <br /> Rounded pea gravel is permitted with a minimum diameter of <br /> 1/8"and a maximum diameter of 3/4". <br /> 7.2 Piping Crossovers <br /> For flexible piping systems which 8.2.2 Crushed Stone <br /> have piping crossovers, install the <br /> crossover supports at each Crushed stone is permitted providing it shall be washed clean <br /> intersection. and be of the free flowing type with an angular stone size <br /> between 1/8" and 1/2". (Meets ASTM C-33 paragraph 9.1 <br /> requirements.) <br /> 8.2.3 Sand <br /> River or other approved sand is permitted providing it shall be <br /> 7.3 Piping Supply Capacity washed clean and is free flowing. When backfilling,make sure <br /> For a pressure piping system using single piping runs routed in sand is evenly distributed and packed around the piping. <br /> series, no more than a total of six dispensing nozzles should be NOTE' A minimum of 6" (150mm) of approved <br /> serviced with a 1-1/2"single piping line to prevent unacceptable bedding material shall be spread evenly along the <br /> product flow rates. bottom of the piping trench. All bedding and backfill <br /> material should be dry and free from ice and snow and <br /> debris. Using material other than those described <br /> 7.4 Vent Piping Fall above without written approval from Environ Products <br /> If GeoVent" Piping is used for vent lines, make sure there is Inc. will void the product warranty. <br /> adequate fall back to the tank from the vent stack. <br /> 7.5 Product Sequence 8.3 GeoFlex Pipe Sloping <br /> If a continuous slope or"fall"is required from the last dispenser <br /> The dispensing product sequence will alternate from one on a piping run to the tank,then the tanks should be buried at <br /> dispenser to the next when "loop-around" is used. Pipe a sufficient depth and the pipe entry height into the dispenser <br /> crossovers are recommended at these points to correct the sump should be of sufficient elevation so that 1/8" of fall per <br /> change in product sequence in "series" routing of pressure lineal foot is maintained. <br /> piping systems if required. <br /> 8.3.1 Pressure Piping Systems <br /> 8.0 PIPE BURIAL REQUIREMENTS Pressure piping systems which are designed to meet the <br /> GeoFlex®, GeoVent and GeoDuctT' are strong, yet still flexible, specification of the GeoFlex System Warranty must be used in <br /> piping systems and must be buried in such a manner that they conjunction with the pipe sensor of the Environ LDS Leak <br /> will not compress. The burial requirements depend on proper Detection System. If the system warranty is desired, the <br /> pipe trenching, backfill material and burial depth. Follow these difference in elevation of the piping between two dispenser <br /> instructions for warranty compliance: sumps must not be greater than 30".The pipe sensor must also <br /> be placed in the terminating dispenser sump or tank sump, <br /> whichever is at a lower elevation. <br /> 8.1 Trench Sizing <br /> NOTE: Check your local code regulations for fall <br /> Piping trenches should be dug in requirements other than that which is previously <br /> such a manner that the trench width stated. <br /> is equal to at least twice the width of <br /> all the flexible pipes contained 8.3.2 Suction Piping Systems <br /> within. All piping should be <br /> positioned in the trench so all are a Sloping the GeoFlex piping from the dispenser back to the tank <br /> minimum of 2"(50mm)apart. Trench is always required for suction piping systems where <br /> turns should be sweeping rather than maintaining prime is necessary. Shallow dispenser sumps or <br /> sharp angles unless coax elbows and deep dispenser pans (coax couplings &fittings must be used) <br /> tees are used. The bottom of the are recommended for use in this application. <br /> trench should be as uniform as possible to eliminate high spots <br /> 9 <br />