My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
INSTALL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 4:53:16 PM
Creation date
5/12/2022 4:53:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2001
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stage 11 Pipe <br /> Stage II Pipe Entries <br /> Stage II vapor recovery pipe entries must be field installed for both Custom Entry Boots. These four applications include both single and double wall pip- <br /> and Standard Dispenser Pans. There are four recommended applications for ing applications as well as non-functional stage II pipe entries. Note: Stage II <br /> accommodating stage II entries using either the Stage II Entry Kit or Flexible pipe entries must be installed after the Pipe Entry Boots. <br /> Application#1 Application #2 Application #3 Application#4 <br /> This application shows the Stage Il This application shows the Stage 11 This application shows the Stage II This application shows a 1"Flexible <br /> Entry Kit being installed with the 3 x Entry Kit being installed with both Entry Kit being installed for purpos- Entry Boot being installed to seal <br /> 2 rubber bushing for sealing directly the 3 x 2 and 1 x 2 rubber bushing es of capping-off the stage II vapor the 1"stage II vapor recovery pipe. <br /> to the 1-1/2"x 1"steel reducer bush- for sealing directly to 1" stage II recovery line for future use. This application does not permit <br /> ing. Permits connection of the Flexible recovery pipe. Permits connection Permits connection of the Flexible connection of the Flexible Isolation <br /> Isolation Tube. of the Flexible Isolation Tube. Isolation Tube. Tube. <br /> I <br /> '15) <br /> Flex Connector Isolation <br /> Installation Dispenser Pan Cuff Connections <br /> The rubber tube is sized so that it will seal to 3"nominal pipe and slide over this After primary pipe assembly and testing, shift the isolation tube up and over <br /> pipe so that the flexible connector may be visually inspected during testing. If the cuff located under the dispenser pan. Seal the lower and upper isolation <br /> sealing is required to 2" nominal pipe at the lower end,then use the 3" x 2" tube joints by installing the two band clamps and tightening each to 60 inch <br /> Rubber Reducer Seal which must be inserted onto the 2"pipe before assembly. pounds. The isolation tube may be individually tested to 5 psi using the air <br /> This size isolation tube is designed for dispenser pan connections. valve stem provided. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.