Laserfiche WebLink
piping (cross-sectional diagram, including connections to tank and dispensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br /> provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)], or <br /> (B) V/ Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)l <br /> _ Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> _ No valves or pumps installed below grade. <br /> _ inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) V Underground primary piping will meet all of the following requirements <br /> _V111 Primary piping in contact with hazardous substance under normal operation conditions shall be: <br /> nstalled inside a secondary containment system in the form of: ✓secondary pipe_Vault or <br /> _ a collection sump at the lou point of the piping. <br /> Lined trench to be sloped to <br /> V/ Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> _ Lined trench used as secondary containment <br /> _ Material compatible with the substance stored. <br /> _ Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> _V/ Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. II <br /> V/ Automatic line Leak detectors will be installed on pressurized piping O <br /> Manufacturer: P "5� Model F X <br /> sla Sex tAos�- <br /> _ Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. <br /> State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21 Plan review and operating permit fees paid. II t l <br /> 22 What is the approximate depth to round water: <br /> 1 <br /> (include source of information orehole togsmonitoring <br /> well data, water C- <br /> - <br /> studies, etc.) �` S� w,, a�c,p�,y� 1v+J wp ,. �-1 <br /> 23 ✓ Total number of tanks on site after installation: S <br /> 24 County/City Fire District and Building Department notified. <br /> 25 ✓ In the event contamination is observed, confirmed or suspected as a result of a Leaking UST system it is your <br /> responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements) as an <br /> act�veties.tor tForufurtherit a workpLan to assistance contac0t theSite <br /> SFite'Mation itigationtUnitoatt(209)initiating <br /> 469-3450. <br /> assessment <br /> mus <br /> or t acknowledge this responsibility for workplan submittal by signature and date below. <br /> Fui`N91`e6udfry�r r$ , D:rs,, � J� �v. �, 'Aate <br /> 71Q b.7 ireTitle <br /> CONDITIONS OF APPROVAL: <br /> cg <br />