Laserfiche WebLink
NPE <br />MID PACIFIC ENGINEERING, INC. <br />REDDING <br />530-246-9499 P <br />530-246-9527f <br />WEST SACRAMENTO <br />916-927-7000 p <br />916-372-9900 f <br />GEOTECHNICAL ENGINEERING I EARTHWORK TESTING I MATERIALS ENGINEERING AND TESTING I SPECIAL INSPECTIONS <br />Project: Solari Ranch Phase 3 <br />Location: Parcel IDS: 17328025,17328003,17328001 <br />May 03, 2022 <br />On the date of May 11, 2022, following permit approval, ten 4'/ inch auger borings will be <br />drilled to depths of ranges 10-15 feet below existing site grades to obtain geotechnical soil <br />samples at the location shown on the attached aerial photograph. Upon completion of <br />drilling and sampling of the boring, the boring will be backfilled with a neat cement grout in <br />accordance with the San Joaquin Environmental Health Department requirements. <br />Daniel Rivera, EIT <br />Staff Engineer <br />Mid Pacific Engineering, Inc. <br />916-927-7000 — office <br />9i6-372-9900 —fax <br />916-916-662-0909 — cell <br />6310 STATE HIGHWAY 273, ANDERSON, CALIFORNIA 96007 <br />840 EMBARCADERO DRIVE, SUITE 20, WEST SACRAMENTO, CALIFORNIA 95605 <br />