Laserfiche WebLink
-2- <br /> PA-2100164 (UP) <br /> 3) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering Mews Record. <br /> (Resolution R-00-433) <br /> d) The Regional Transportation Impact Fee shall be required for this application_ The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> 5) The Water Supply Facilities Impact Mitigation Fee shall be required for this development_ The fee <br /> is due and payable prior to issuance of the building permit. The fee will be based on the current <br /> schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> 6) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6) foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be Calculated and submitted along with a drainage plan for review and approval, prior to <br /> release of building permit, (Development Title Section 9-1135) <br /> AC.CH <br />