My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014935
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVONE
>
6820
>
2600 - Land Use Program
>
PA-2200028
>
SU0014935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2023 10:50:49 AM
Creation date
5/13/2022 1:59:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014935
PE
2620
FACILITY_NAME
PA-2200028
STREET_NUMBER
6820
Direction
E
STREET_NAME
NAVONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215-
APN
10112031
ENTERED_DATE
5/13/2022 12:00:00 AM
SITE_LOCATION
6820 E NAVONE RD
RECEIVED_DATE
5/12/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> Electric Company <br /> 11. Cathodic Protection- PG&E pipelines are protected from corrosion with an "Impressed <br /> Current" cathodic protection system. Any proposed facilities, such as metal conduit, pipes, <br /> service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG&E Corrosion Engineering. <br /> 12_ Pipeline Marker Signs- PG&E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sigil <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work_ The pipeline marker must be moved back once construction is <br /> complete. <br /> 13. PG&E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California_ Therefore, any plans that impact PG&E's facilities must be reviewed and <br /> approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities. <br /> PG&E Gas and Electric Facilities Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.