Laserfiche WebLink
i <br /> i <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed? YES [ ] NO �c] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the " Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component, describe how this will be done. ( If I <br /> adding piping , UDC 's , or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review) : <br /> Install new Diesel (like for like) OPW 71 SO Drop Tube due to failed OFP Test, <br /> i <br /> i <br /> I <br /> t <br /> I <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third-party approval) : i <br /> OPW 71 SO Drop Tube E <br /> I <br /> 1 <br /> 1 <br /> 1 <br /> J <br /> 7 <br /> 3 <br /> j <br /> S <br /> f <br /> EH230038 (revised 12-11 -15) 3 <br /> i <br /> i <br />