Laserfiche WebLink
11. Please include a copy of any studies (soils , geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site. <br /> C. PROJECT CEARA=-RISTICS <br /> 1. Services: Indicate how the following services w411 be provided <br /> for your project and availability cf service. <br /> a. Water Supply: California Water Service Co. <br /> b. Sewage Disposal: rsA jf15 <br /> C. Storm Drainage: S. and S .J. Irrigation District <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what ageacy will be providing the <br /> services ) , -and the distance of the extension(s ) :a) Extension of <br /> Cal-Water line at Picolli Road; b) Tie-in to sewer line at Highway 88 : <br /> c) Tie-in to pond be raeen Cer?ro and Anhausier-Busch <br /> d. Natural Gas: P G & E <br /> e. Electricity: P G & E <br /> r . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> Wilcox Road Extension <br /> g. <br /> Fire:Waterloo-MoradzDistance to nearest fire station: = 5 miles <br /> h. Schools: Waterloo School <br /> Describe any site alterations which result from the proposed pro- <br /> ject (specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of t=ees removed, etc. ) . <br /> No maior -rade than es will occur <br /> Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> N/P <br /> Types of emissions and. sources associated with project N/A <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project N/A - <br /> Will the project rest:lt in substantial ai_ emissions or deteriora- <br /> tion. of ambient air reality? % NO Y'S <br /> 4 . flow much agricultural land will be removed from production? <br /> 35. 67 acres <br /> -rr 1Catec Not irr' cated Y <br />