Laserfiche WebLink
11 . Please include a copy of any studies ( soils , geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site . <br /> C . PROJECT CHARACTERISTICS <br /> 1. Services : Indicate how the following services will be provided <br /> for your project and availability of service . <br /> a . Water Supply: q If R 61, k)A!r-Z 9 S C W r 2 J 1 I S i . <br /> b. Sewage Disposal: :D , <br /> C . Storm Drainage: C A iv n A-o, �l 14Z 0 c►�� <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service(s ) , and the distance of the extension( s ) : <br /> d. Natural Gas : , <br /> e . Electricity: <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> 9AUEn , Avonl A L_ Rem )) <br /> g . Fire: L. A; Hgn p Distance to nearest fire station: apo <br /> h . Schools: 1y) Afl, FC' A (ItjIPiT-� 11 SO1:� r)n► DIS 1 <br /> 2 . Describe any site alterations which result from the proposed.pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of trees removed, etc. ) . <br /> NON � <br /> 3 . Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> NONC <br /> Types of emissions and sources associated with project N0 N C <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? 1/ NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> NONG <br /> Irrigated Not irrigated <br /> Minor Subdivision - 9 - ( 6/86 ) <br />