Laserfiche WebLink
Engeo Inc. <br /> I� Location Holly Master Plan-Building H&I Operator JM-IY <br /> `m Job Number 15188.000.006 Cone Number DDG1596 GPS <br /> Hole Number CPT-02 Date and Time 10/22/20212:14:53 PM <br /> Equilized Pressure 5.0 EST GW Depth During Test 11.5 <br /> 23.13 . <br /> a <br /> Z) <br /> w <br /> U) <br /> U) <br /> w <br /> IL <br /> zz1 <br /> 0 Time(Sec) 800.00 <br /> Page 1 of 1 <br />