Laserfiche WebLink
Engeo Inc. <br /> I� Location Holly Master Plan-Building H&I Operator JM-IY <br /> `m Job Number 15188.000.006 Cone Number DDG1596 GPS <br /> Hole Number CPT-07 Date and Time 10/22/2021 8:14:45 AM <br /> Equilized Pressure 5.5 EST GW Depth During Test 11.4 <br /> 24.&_ . <br /> N <br /> 7 <br /> W <br /> 7 <br /> to <br /> to <br /> W <br /> IY <br /> IL <br /> 0 Time(Sec) 600.00 <br /> Page 1 of 1 <br />