Laserfiche WebLink
MEETING AGENDA <br />SAN JOAQUIN COGENERATION, LLC (17200 Murphy Parkway, Lathrop, CA) <br />CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD – <br />CENTRAL VALLEY REGION <br />11020 Sun Center Drive, Suite 200, Rancho Cordova, CA <br />Date: 07 February 2019 <br />Time: 11:00 AM <br />Attendees: Water Board - Ann Palmer, Gerald Djuth <br />San Joaquin Environmental Health Department, Robert McClellon <br />Brian Millman, Advanced GeoEnvironmental, Inc. <br />Robert Marty, Advanced GeoEnvironmental, Inc. <br />Martin Wenzel, San Joaquin Cogeneration, LLC. <br />Kyle McCormick, San Joaquin Cogeneration, LLC. <br />Barbara Guiltinan, San Joaquin Cogeneration, LLC. (call-in) <br />Chris Watson, Lakeshore Partners <br />Blackstone Consulting, consultant for Lakeshore Partners (call-in) <br />1. Initial Site Investigation Work Plan - Final <br />a. Summary of proposed scope of work and specific purpose of work during <br />this phase of the investigation. <br />b. Discussion of schedule of work. <br />c. Request water board comments on scope of work, purpose, and schedule <br />to ensure the most efficient process for this phase of work and potential <br />future phases of work. <br />2. Additional Site Investigation/Remediation <br />a. Discussion of additional site investigation and potential remediation based <br />on the results of the initial investigation. <br />b. Discussion of requirements if soil and groundwater are not impacted. <br />3. Pathway to Closure <br />a. Site has sale pending; both sides would like to identify a pathway to closure.