My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
CORRESPONDENCE_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:12:51 PM
Creation date
5/20/2022 11:54:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2019
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEETING AGENDA <br />SAN JOAQUIN COGENERATION, LLC (17200 Murphy Parkway, Lathrop, CA) <br />CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD – <br />CENTRAL VALLEY REGION <br />11020 Sun Center Drive, Suite 200, Rancho Cordova, CA <br />Date: 07 February 2019 <br />Time: 11:00 AM <br />Attendees: Water Board - Ann Palmer, Gerald Djuth <br />San Joaquin Environmental Health Department, Robert McClellon <br />Brian Millman, Advanced GeoEnvironmental, Inc. <br />Robert Marty, Advanced GeoEnvironmental, Inc. <br />Martin Wenzel, San Joaquin Cogeneration, LLC. <br />Kyle McCormick, San Joaquin Cogeneration, LLC. <br />Barbara Guiltinan, San Joaquin Cogeneration, LLC. (call-in) <br />Chris Watson, Lakeshore Partners <br />Blackstone Consulting, consultant for Lakeshore Partners (call-in) <br />1. Initial Site Investigation Work Plan - Final <br />a. Summary of proposed scope of work and specific purpose of work during <br />this phase of the investigation. <br />b. Discussion of schedule of work. <br />c. Request water board comments on scope of work, purpose, and schedule <br />to ensure the most efficient process for this phase of work and potential <br />future phases of work. <br />2. Additional Site Investigation/Remediation <br />a. Discussion of additional site investigation and potential remediation based <br />on the results of the initial investigation. <br />b. Discussion of requirements if soil and groundwater are not impacted. <br />3. Pathway to Closure <br />a. Site has sale pending; both sides would like to identify a pathway to closure.
The URL can be used to link to this page
Your browser does not support the video tag.