<br /> 3 <br /> <br />This SWPPP is required to be filed electronically to the SWRCB and will be uploaded to the <br />SMARTS website upon its completion to be included with the PRDs. This SWPPP must be re-filed <br />after any future updates or amendments to the document. <br />SECTION 1.3 - SWPPP AVAILABILITY AND IMPLEMENTATION <br /> <br />The General Permit (Section XIV.C) requires the SWPPP be available at the construction site during <br />working hours while construction occurring and shall be made available upon request by a State or <br />Municipal inspector. When the original SWPPP is retained by a crewmember in a construction <br />vehicle and is not currently at the construction site, current copies of the BMPs and map/drawing <br />will be left with the field crew and the original SWPPP shall be made available via a request by <br />radio/telephone. The SWPPP shall be implemented concurrently with the start of ground <br />disturbing activities. <br /> <br />Construction at this site is projected to last a total of three and one-half (3-1/2) months, with site <br />clearing and grading beginning in February 2019. Please note, this SWPPP has been prepared based <br />on these estimated construction dates. If the construction schedule is projected to be outside of <br />these dates, notify the SWPPP preparer immediately to determine the applicability of the SWPPP <br />requirements and amend the SWPPP and/or PRDs as necessary. This SWPPP will be maintained <br />and updated on-site throughout the construction process. Under the General Permit, this SWPPP <br />shall be available to the public. Upon request by members of the public, this SWPPP shall be made <br />available for review to either the Regional Water Board or directly to the requestor. <br />SECTION 1.4 - SWPPP AMENDMENTS <br /> <br />The General Permit requires that the SWPPP be amended or revised by a Qualified SWPPP <br />Developer (QSD) (General Permit Section XIV.A) and that the SWPPP include a listing of the date <br />of initial preparation and the date of each amendment. Amendments must be signed by a QSD <br />(General Permit Section VII.B.6). <br />The amendment records for this SWPPP are logged in Appendix C <br />