<br /> 9 <br /> <br />Table 2 - Project Combined Risk <br /> Sediment Risk <br />Low Medium High <br />Receiving <br />Water Risk <br />Low 1 2 2 <br />High 2 2 3 <br /> <br />PROJECT COMBINED RISK IS LEVEL 1. <br />SECTION 2.4 - CONSTRUCTION SCHEDULE <br /> <br />Construction at this site is projected to start February 6, 2019 and continue until May 22, 2019, for a <br />total of three and one-half (3-1/2) months. Please note, this SWPPP has been prepared based on <br />these estimated construction dates. If the construction schedule is projected to be outside of these <br />dates, notify the SWPPP preparer immediately to determine the applicability of the SWPPP <br />requirements and amend the SWPPP and/or PRDs as necessary. The Qualified SWPPP <br />Practitioner shall obtain a copy of the detailed construction schedule including BMP deployment <br />dates and include it in Appendix F. <br />SECTION 2.5 - POTENTIAL CONSTRUCTION SITE POLLUTANT SOURCES <br /> <br />Table 3 – Potential Construction Site Pollutant Sources <br />Construction Activity or <br />Potential Pollutant Source <br />Pollutants Dust Sediment Nutrients Trace Metals Pesticides Oil, Grease, Fuels Other Toxic Chemicals Misc. Waste Vehicles and Equipment Use <br />Vehicles and equipment entering and leaving the project <br />site X X X X X X <br />Vehicles and equipment movement and use within the <br />project site X X X X X X <br />Temporary parking lots and staging areas X X X X X <br />Exposed Areas X <br />Areas of exposed soil that have been cleared and <br />grubbed X X X X X <br />Areas of exposed soil that have been excavated, filled, <br />compacted, or graded X X X X X <br />Construction staging areas X X X X X <br />Vehicle and equipment storage and service areas X X X X X X <br />Material processing areas and transfer points X X X X X X <br />Construction roads X X X X X <br />Spilled Materials X X X X X X <br />Construction stockpiles X X X X X <br />Construction Activities <br />Land clearing and grubbing X X X X X X X X <br />Earthwork including soil excavation, filling, soil <br />compaction, rough grading, and final grading X X X X X X X X <br />Drilling and blasting X X X X X