My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 16 <br /> <br />Control Inspection Frequency Maintenance/Repair Measures <br />Diversion Berms Monthly and prior & after <br />storms <br />Regrade and eroded areas on berm <br />upstream face remove accumulated <br />debris <br />Silt Basins Monthly and prior & after <br />storms <br />Remove accumulated sediment as <br />necessary (w/o allowing discharge to <br />storm drain) repair erosion damage <br />unclog outlet riser <br />Straw Wattles Monthly and prior & after <br />storms <br />Remove accumulated sediment as <br />necessary <br />Drop Inlet <br />Sediment Filters <br />Monthly and prior & after <br />storms <br />Remove accumulated sediment as <br />necessary <br /> <br /> <br />SECTION 5 - TRAINING <br /> <br />After July 1, 2012, the General Permit requires (Section VII) that all elements of the SWPPP be <br />developed by a QSD and implemented by a QSP. The QSP may delegate tasks to trained employees <br />provided adequate supervision and oversight is provided. <br />Personnel at the site shall receive training appropriate for individual roles and responsibilities on the <br />project. Appropriate personnel shall receive training on SWPPP implementation, BMP inspection <br />and maintenance, and record keeping. Document all training activities (formal and informal) and <br />retained a record of training activities in SWPPP Appendix I. Training documentation must also be <br />submitted in the Annual Report. <br /> <br />SECTION 6 - RESPONSIBLE PARTIES AND OPERATORS <br /> <br />SECTION 6.1 - RESPONSIBLE PARTIES <br /> <br />See page i for Responsible Parties Contact List. <br />SECTION 6.2 - CONTRACTOR LIST <br /> <br />The contractor shall list all subcontractors with the specific areas of responsibility and emergency <br />contact numbers of each subcontractor. The list is also required to include telephone numbers and <br />work addresses. The list shall be kept in Appendix J. <br />
The URL can be used to link to this page
Your browser does not support the video tag.