My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Order <br />2009-0009-DWQ amended by 2010-0014-DWQ & 2012-0006-DWQ <br /> 37 <br /> <br />XIV. SWPPP REQUIREMENTS <br /> <br />A. The discharger shall ensure that the Storm Water Pollution Prevention <br />Plans (SWPPPs) for all traditional project sites are developed and <br />amended or revised by a QSD. The SWPPP shall be designed to address <br />the following objectives: <br /> <br />1. All pollutants and their sources, including sources of sediment <br />associated with construction, construction site erosion and all other <br />activities associated with construction activity are controlled; <br /> <br />2. Where not otherwise required to be under a Regional Water Board <br />permit, all non-storm water discharges are identified and either <br />eliminated, controlled, or treated; <br /> <br />3. Site BMPs are effective and result in the reduction or elimination of <br />pollutants in storm water discharges and authorized non-storm water <br />discharges from construction activity to the BAT/BCT standard; <br /> <br />4. Calculations and design details as well as BMP controls for site run-on <br />are complete and correct, and <br /> <br />5. Stabilization BMPs installed to reduce or eliminate pollutants after <br />construction are completed. <br /> <br />B. To demonstrate compliance with requirements of this General Permit, the <br />QSD shall include information in the SWPPP that supports the <br />conclusions, selections, use, and maintenance of BMPs. <br /> <br />C. The discharger shall make the SWPPP available at the construction site <br />during working hours while construction is occurring and shall be made <br />available upon request by a State or Municipal inspector. When the <br />original SWPPP is retained by a crewmember in a construction vehicle <br />and is not currently at the construction site, current copies of the BMPs <br />and map/drawing will be left with the field crew and the original SWPPP <br />shall be made available via a request by radio/telephone.
The URL can be used to link to this page
Your browser does not support the video tag.