My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C <br />2009-0009-DWQ as amended by 2010-0014-DWQ & 2012-2006-DWQ <br />4 <br />all non-visible pollutants which are known, or should be known, to <br />occur on the construction site. At a minimum, when developing BMPs, <br />Risk Level 1 dischargers shall do the following: <br /> <br />a. Consider the quantity, physical characteristics (e.g., liquid, powder, <br />solid), and locations of each potential pollutant source handled, <br />produced, stored, recycled, or disposed of at the site. <br /> <br />b. Consider the degree to which pollutants associated with those <br />materials may be exposed to and mobilized by contact with storm <br />water. <br /> <br />c. Consider the direct and indirect pathways that pollutants may be <br />exposed to storm water or authorized non-storm water discharges. <br />This shall include an assessment of past spills or leaks, non-storm <br />water discharges, and discharges from adjoining areas. <br /> <br />d. Ensure retention of sampling, visual observation, and inspection <br />records. <br /> <br />e. Ensure effectiveness of existing BMPs to reduce or prevent <br />pollutants in storm water discharges and authorized non-storm <br />water discharges. <br /> <br />6. Risk Level 1 dischargers shall implement good housekeeping <br />measures on the construction site to control the air deposition of site <br />materials and from site operations. Such particulates can include, but <br />are not limited to, sediment, nutrients, trash, metals, bacteria, oil and <br />grease and organics. <br /> <br />C. Non-Storm Water Management <br /> <br />1. Risk Level 1 dischargers shall implement measures to control all non- <br />storm water discharges during construction. <br /> <br />2. Risk Level 1 dischargers shall wash vehicles in such a manner as to <br />prevent non-storm water discharges to surface waters or MS4 <br />drainage systems. <br /> <br />3. Risk Level 1 dischargers shall clean streets in such a manner as to <br />prevent unauthorized non-storm water discharges from reaching <br />surface water or MS4 drainage systems. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.