Laserfiche WebLink
  <br />Former Pilkington North America Site    3           Health and Safety Plan  <br />              EKI B90047.00  <br /> Recording the occurrence of any Site injury or illness.  <br /> Reporting unsafe or unhealthful conditions to the responsible employer.  <br />  <br />The SSO and FSSO have the authority to suspend the operations of EKI employees and EKI  <br />subcontractors if it is determined that Site conditions have become unsafe.  The SSO and FSSO  <br />will also be members of the Site characterization team and will have project responsibilities in  <br />observing and participating in characterization activities.  Conflicts, if any, between the multiple  <br />responsibilities of the SSO and FSSO will be resolved with the participation of the Project Manager  <br />or Corporate Health and Safety Manager.    <br />2. TASK / OPERATION SAFETY AND HEALTH PLAN   <br />This section provides a brief description and history of the Site and discusses the proposed Site  <br />activities, associated health hazards, and appropriate protective actions.  <br />2.1 Site Description and History  <br />The Site currently has a physical address of 500 East Louise Avenue, Lathrop, California, and is  <br />located on the south side of East Louise Avenue approximately 400 feet east of the intersection  <br />of East Louise Avenue and Harlan Road (Figure 1‐1). The Site is located adjacent to a mixed  <br />residential, commercial and industrial area of the City of Lathrop, San Joaquin County, California.   <br />The Site is bordered to the west by a vacant field and a McDonalds restaurant, to the south by  <br />the former San Joaquin County Cogeneration Power Plant (“Cogen”) facility and a recently  <br />completed 870,000 square‐foot (“sf”) warehouse for commercial and light industrial purposes,  <br />and to the east by the former Occidental Chemical Company (“Oxy Chem”) and current JR Simplot  <br />Company (“JR Simplot”) sites.   <br />The  Former Pilkington North America (“PNA”) facility at the Site includes  a large structure  <br />formerly utilized for glass  manufacturing and distribution, two smaller  stand‐alone  metal  <br />warehouse buildings, a sanitation plant, stormwater reservoir, sprayfields and asphalt parking  <br />areas. Glass manufacturing operations ceased in 2014 after over 50 years of operation.  A  <br />furnace, furnace stack, conveyance machinery, above ground storage tank, and other facilities  <br />associated with the manufacturing process have been demolished pursuant to permits from the  <br />City of  Lathrop. The  Site  is principally occupied by  a  Kraft Heinz  distribution  center.   The  <br />northeastern portion of the Site is generally vacant and undeveloped with the exception of a rail  <br />spur.  The rail spur is located along the southern portion of the Site and then extends to the  <br />northeast corner of the Site.    <br />2.2 Summary of Prior Subsurface Investigations Conducted on the Site  <br />This section describes prior subsurface investigations at the Site as summarized in the Soil  <br />Management Plan prepared by EKI in May 2019.  Locations described and bulleted below are  <br />shown on Figure 1‐2.  Field activities conducted by EKI in summer 2019 will target the Diesel Spill  <br />area.