Laserfiche WebLink
  <br />Former Pilkington North America Site    15           Health and Safety Plan  <br />              EKI B90047.00  <br />  <br />5.4 Decontamination  <br />Primary Level D decontamination procedures will include:  <br />  <br /> Removal of personal protective equipment, such as gloves, coveralls;  <br /> Washing of sampling equipment with distilled water and Liquinox solution; and  <br /> Brushing, vacuuming, steam‐cleaning, or high‐pressure washing drilling or excavation  <br />equipment. All steam‐cleaning or high‐pressure washing will be conducted in an area  <br />where  steam‐cleaning water will  be contained in  55‐gallon drums for subsequent  <br />characterization and disposal.  <br />  <br />If Level C personal protection is required, minimum decontamination procedures associated with  <br />Level C protection will be established and followed within the CRZ. These procedures are the  <br />same for Level D, but also include the following:  <br />  <br /> Removal  of proper  personal protection  equipment  followed  by removal of  the  air  <br />purifying respirator;  <br /> Decontamination procedures (as described above) and preliminary respirator cleaning  <br />using “wipes”;  <br /> Washing of boots and equipment prior to leaving the CRZ; and  <br /> Bagging and disposal of respirator cartridges and personal protection equipment at the  <br />end of each day.  <br />  <br />If Level C personal protection is required, reusable personal protective equipment and sampling  <br />equipment will  be decontaminated  by washing the equipment  with  a  trisodium phosphate  <br />solution  and rinsing with deionized water.  A decontamination a rea will be set up within the CRZ,  <br />and  visqueen will  be  put down  beneath the  area to  contain  any fluids  generated  during  <br />decontamination activities.  All fluids and disposable equipment will be properly contained in  <br />labeled drums and disposed after appropriate characterization.  <br />  <br />If an injury occurs to personnel who are in Level C protection, decontamination procedures will  <br />be followed to the extent reasonable based upon the nature of the injury.   <br />  <br />Vehicles and Large Equipment: The  decontamination  process, to be  implemented  by the  <br />Contractor, will include the removal of accumulated dirt and other contamination from the  <br />vehicles and equipment  while said  vehicles and  equipment remain in  the  established  <br />decontamination zones and before exiting to support zones or public streets.  Vehicles operated  <br />by EKI or EKI subcontractors within any established EZ or CRZ at the Site will be decontaminated,  <br />as needed, consistent with the requirements of the Contractor.