My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
CORRESPONDENCE_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:13:44 PM
Creation date
5/24/2022 12:09:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2020
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised Additional Site Assessment Work Plan <br />Former SAN JOAQUIN COGENERATION <br />17200 Murphy Parkway, Lathrop, San Joaquin County, California <br />(APN 198-120-05) <br /> <br />TABLE OF CONTENTS <br /> <br /> <br />SECTION PAGE <br /> <br />1.0. INTRODUCTION ................................................................................................... 1 <br />2.0. BACKGROUND .................................................................................................... 1 <br />3.0. SCOPE OF WORK AND PROCEDURES ............................................................. 2 <br />3.1. PRE-FIELD WORK ACTIVITIES ........................................................................ 2 <br />3.2. SOIL BORING ADVANCEMENT AND ANALYSIS ............................................ 3 <br />3.3. SOIL BORING ADVANCEMENT – SOUTH WASTE CELL ............................... 3 <br />3.4. SOIL BORING ADVANCEMENT – FORMER POWER PLANT AREA .............. 3 <br />3.5. SURFACE SAMPLE COLLECTION – FORMER POWER PLANT AREA ......... 4 <br />3.6. WASTE CELLS .................................................................................................. 4 <br />3.7. SAMPLE ANALYTICAL PROCEDURES ........................................................... 5 <br />3.8. BORING ABANDONMENT ................................................................................ 5 <br />3.9. EQUIPMENT DECONTAMINATION AND WASTE MANAGEMENT ................. 5 <br />3.10. REPORT PREPARATION ................................................................................. 6 <br /> <br /> <br />FIGURES <br /> <br />Figure 1 - Location Map <br />Figure 2 - Site Plan <br />Figure 3 - Dioxin and Furan Results in Soil and Waste Samples: East Property Boundary <br />Figure 4 - Dioxin and Furan Results in Soil and Waste Samples: Former Power Plant <br />Figure 5 - PCB Results in Soil and Waste Samples: Former Power Plant <br />Figure 6 – Geologic Cross Section A-A’ <br />Figure 7 – Geologic Cross Section B-B’ <br />Figure 8 – Geologic Cross Section C-C’ <br />Figure 9 – Geologic Cross Section D-D’ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.