Laserfiche WebLink
PERFORMANCE SPECIFICATION - CONT. <br /> SECTION IV TANK INSTALLATION-CONTINUED SECTION V CONCRETE-CONTINUED SECTION VI PIPING <br /> x <br /> PART 3-INSTALLATION-CONTINUED PART 3-EXECUTION PART 1 -GENERAL s <br /> 3. MPATSLE NR-HARDEN N.PIPE SF NT TO INTERNAL 3.1 ABLISH AND MAINTAIN LINES AND GRADES FOR CONCRETE ITEMS BY MEANS OF LINE AND GRADE ,.1 THIS BECTON COVERS THE FURNISHING OF ALL LABOR MAT RIALS SERVICED.EQUIPMENT AND RELATED <br /> eusHR THREags.FERMaNENTMETaLFwcs sHau BElrvsTausoaTau urvuseDRENINcs. sTAKESAND SCREEDS. REQUIRED IN CONJUNCTIONVOTH OR IN TOA COMPLETE PIPING.YSTEM FORA GABOUNE <br /> INSTALTLACTION. <br /> 1.1 TIE PL TO EUV 4NTH THEEPiucSC F'E SHALi TO BE <br /> NOT To caoSeETOHREAD oaTRAM GE THE NONTMETH5 uc 9usHiNGs 32 uREooKwITHSTANo LACINGG OFCONCRETEPNOMANTAIN DIMENSIONS <br /> EIR SIAPESANoro3ITIONs.MAKE FIRMscEN <br /> WHEN REPLACING PLUGS R INSTALLING REQUIRED TANK PIPING. SUFFICIENTLY TIGHT AND SUBSTANTIALLY ASSEMBLED TO PREVENT BULGING OR LEAKAGE ASSEMBLE FORMS IN SUCH A <br /> N, PART 2-PRODUCTS <br /> 3 CWET ONSTRUE IN.TPLLATION.SHOULD GROUND WATER BE PRESENT IN TANK IXCaVARONS,T-ELLEN'S LOCAL gNONATMouTiNOEON ATio soR6 N0.S.INSTALLLL SLEE�VESFlM4NMOLES CAR <br /> oxESHND Po3PoTs irvnO 21 as SPECIFIED BY <br /> CONSTRUCTION ENGINEER MOST BE NOTIFIED EVAT'D OF�INisHEO CONCRETES NFAATLFEINIAHEDGE-EXPPOSEICONCFETEHLONc JO.NITHARHOPTLV -LEVEN.PIPING <br /> MRUSTLs OP'E',te PER FOOT MINIMUMLFROM DISPENSERLIS'LAND TO STP SUMF'R"� <br /> 3.7.1 POINT'.WATER SHALL BE KEPTAT LOWEST Po IELPOINT BY WELL POINT 3Y5UEM(3)ND ROUNDED EDGING TOOL. <br /> PROPERLY SEED PUMPE). 2.2 VENTPIPIN PIPING SHALL BE FIBERGLASS PIPE.VENT UNE RISERS SHALL BE LACK IRON PIPE AND EXPEND 5ABOVE Prob i,-05-18 <br /> 3.3 RDrvFOROEMENT.FURNISH AND INSTALL ALL REwFoaDIrvc STEEL INDICATED ON DRAwTNC METAL REINFORCEMENT AT VE FINISHED GRADE VENT LINE SHALL NOT BE INSTALLED ON BULGING <br /> 3.7.z R's wsTALLAnory wsTRucnorvs.PLACE ENLEP APPROVED IN WRITNc. <br /> 6 FIRM OUTAIDE VERTICAL LINE OF TANK(s)AS oENolEO ON DRAWNGS. RE F)oFCEMEM s1LA B STOREoso As ioEPRFERVENiFRE'FNZiNGLFo'kA MINIMDUM OF 48 HOURS PRIOR TOPoPINADCEMENT TAL 2 ggNc SHALL BE FlBRcwss.PIPING MUST LRE1Ie PR Fool MINIMUM FROM <br /> 3.7.3 TIE DDWNS:SUPPLIED BY TANK MANUFACTURER. SpNFORCEMENTTSHAL eE ACCURATTELY PI-EDD ANO ADE.UAT-ELY SECURE.IN NLsPucEs IN AGENT BARE 3 as PE J'6ER ISANO To TANK'P"� <br /> 3.7.4 DIA THANK Mi REETURNAXsi2EEE3O REIMOVEe SLE BLACK,UnuZE THE TAKE-JP FXTURE FOR 3• 3.a MlwNc arvD IRANSPORnNG CONCREHALL BE_APPED 36 GAM TERcoNRETE SHALL BEREADY MIXEDANDSHALL MEET REQUREMRTSRAsim z SPECIFICATIONS MATERIAL SHALL COMPLY IMTH SPECIFICATIONS FOR APPROVED MATERIAL AND AS PER MArvuFacnRERs r O� <br /> All DELIVERY FUR ¢ OR <br /> 3.7.5 STRAP PLACEMENT.AS PER TANK MANUFACTURERS SPECIFICATIONS. CRHOTON OFFICE WHEN REQLIIR'ED.nCK'ETS SHALL'RE. 6RERTF SLUMM AG OREGATSBEES AIR CAL X Tex Z <br /> NN6 NT(IFANY)ANDBRANDOFCEMENT.NOTEAMOUNTOFWATRADEDATBOB. PART 3-INSTALLATION °- <br /> X7B COATING'.COVER ALL NR-GADONEED HARDWARE WITH TWO F)�TS R ASPHALT RTRAIrvME a r <br /> IMPREGNATED WITH WATERPROOFING PRIOR TO PLACEMENT -FILL. 35 PLACING CONCRETE'. Z W Do Q <br /> 3.1 CTPIPINGANDSPECALTIES SHALL BE INSTALLED IN STRICTACCORDANCE WITH THE MANUFACTURER'S -� c)� <br /> 3.8 LIFTING TANKS SHALL BE LIFTED ONLY AS PER MANUFACTURER'S INST 1-N INSTRUCTIONS,UTILIZING LIFTING LUGS 351 NOTFICATION.THE CRTRACTGR SHALL NOTIFY THE OWNERa LOCAL CONSTRUCTION OFECEAT INSTRUCTIONS AND STATE AND LOCAL CODES U.6 Ty <br /> S.EQUIPMENTOF SUFFICIENT LACEMENT ATTLLF'EAAAST 24 HOURCONTRACTOR <br /> BEFORE vwOIINNGL SHALL <br /> CONCRETEEIiNR EINNWNGS ARE DIAGRAMMATIC AND THE FINAL ARRANGEMENT OF THE WORK SHALL SUIT FIELD COrvomoNS,TE W¢�¢ Zm - w <br /> DENTEDDROPNDOR ISHAN5HIN ANY UTIMZED I_XETTINGLLBE LA-TEDAND TANK <br /> ESUMPEDMANUFACTURER'S <br /> ORDER THAT TRADESAFECTED MAY INSTALL REQUIRED BLOCKING SLEEVED,POCKIEUXETC. 3 F.HE �O W�a <br /> REPRESENTATIVE IMMEDIATELY CONTACTED FOR RELERRPICATIONOFTNKS.MO CT<KOCaILM%RUCTIONoFPICE DBV CONCRETE PLACEMENT 2 DIMENSIONS'IN THE IF0 AEGCLEARANCESCLEARANCES MUSTERE PROVED AND MAINTAINEDOFOR THE ROPERVERIFY <br /> PRATION, W �� N <br /> OR SITE MANAGER IMMEDIATELY UPON NOTICE OF QUESTIONABLPANDLING OF TANKS OR NOTABLE DAMAGE THERETO. 3.5.2 PROTECTION.PROTECT ALL WORK OF OTHER TRADES AS REQUIRED. MAINTENANCE,SERVICE AND REPAIR OF THE WORK. J� W��uuU <br /> 3. BACKRLPLACEMENT:ONCE TANKS ARE PROPRLY SET IN PLACE,CAREFULLY BACKFILL ENTIRE E%CAVATIONL HAND 3.5.3 WETTING T-ORUGHLY WET FORMSAND DAMPEN SAND CUSHIONS BEFORE PLACING CONCRETE. 3. TE,IDENTIFY AND MARK EXISTING UNDERGROUND UTILITIES IN THE AREA OF WORK BEFORE STARTING EARTHWORK WTx _j <br /> SHOVBOTTOM OF TANK(S)SO THEY ARE EVENLY SUPPORTED AROUND BOTTOM.SPECIAL ADEQUATE MEANS OFPRTECTION DURING EARTHWORK I� W; W <br /> ENTION LALLBEPPND TOBOTTOM QUARTER POINTS ELIMINATING ANY VOIDS IN FILL AT THESE POINTS.DO NOT DROP 3.5.4 LACING PLACEALLCONCRETEINACCORDANCEWITHACI 614.MINIMUMCONCREIE GOVERO R PROCEDRES LITES ARE TO REMAIN IN PLACE PROVIDE () r� ED <br /> ED <br /> BACK FRO HIGHDISTA E FILLONTO REQUIRED TO ACHIEVEACCEPTABLE DErvSITY.BACKRL REINFORCEMENT SHALL CONFORM TO AD 3, <br /> B.USE HANDLING EQUIPMENT AN <br /> METI10D.TO VE _ <br /> PTACEMENT PER MANUFACTURER INSTAALLNRONAPECIFICATIONS. INSUREACONTINUOUSFLOWFROM MIXER TOPLACEOFDEPOSITSPACERTAMPAND 3. INCORRECTLY CHARTED PIPING OR OTHER UTILITIES BE ENCOUNTERED DURING IXCAVATO a <br /> THOROUGHLY ANDELIMINaTE CONSTRUCTION MANAGER IMMEDIATELY FOR DIRECTIONS AS TO PROCEDURE.COOPERATE WITH THEN () <br /> 3., LA6RNG:IF GROLIND WATER IS PRESENT TANKS SHALL BE FILLED WITH BALLAST(WATER)TO AVOID SHIFTIER VOIDS.NUS NOT VIBRATE FRESHLY OFOOENCPoREUEoEXCEEo5PA� =AND <br /> PUBLIC AND PRIVATE UTILITY COMPANIES IN KEEPING THEIR RESPECTIVE SERVICES IN SATISFACTORY <br /> TANKS FHLEDWIowATER GO NoiEIMONAL N,ATTANKBE <br /> ABWELEVEL OF BOACKgiLNOT INSTALL suBMRGIBLPUMPSIN 3.6 FINISHING CONCRETE: 3.6 VERTICAL RISERS FROM TANKS FORALL FILL MPEG,VAPOR RECOVERY ADAPER6 AND ALTO GAUGING AGAPTATION6 <br /> SHALL" <br /> A TRUE PLAN PEACE WITH!NO DIP'TION IN"" <br /> OF 1 <br /> 14 MHINT"" <br /> TER PIPE <br /> 3.1 ADEQUATE PROTECTION FOR TANK EXCAVATION 3.6.1 WITHA'PATRAIGHEGGE AT 3•'INTERVALS IN BOTH <br /> q ECTONS.SCREED AND LCAT CONCRETE S�LOTIMERRUPTEIXISTING UTILITIES SERVING FACILITIES OCCUPIED AND USED BY THE OWNER OR OTHERS,EXCEPT <br /> FROMS WITH <br /> MMTMERMP6 OR OTHRRMEAUS PENDING COMPLETION OF INSTALLATION.FXCAVARON H STRAIGHT EDGES TO IN' <br /> NO SURFACE TO REQUIRED FINISHED LEVEL WOOD FLOAT 3. <br /> UNTIL COMPLETE.WATER SHALL NOT WHILE STILL GREEN To A TRUE,EVEN SURFACE WITH NO COARSE AGGREGATE VISIBLE ERVICPERMIE HAS BEEN PROVIDEDBY HE CONSTRUCTION MANAGER,AND THE ONLY AFTER ACCEPTABLE TEMPORARY TTILITY <br /> ALLOWED TO ACCUMULATE IN IXCAVATIONTDE-WARTER A9 REQUIRED TO MAINTAIN EXCAVATION AS DRY AS POSSIBLE. FACE MOST RE HAS gSAPPEARED,,STEEL TROWEL SURFACE TO A SMOOTH,EVEN S <br /> SECTION SHALL BE RVA CONCRETE ° <br /> SURFACE.FRORISTLE RooMroTR LTINHMLEUI M uNIORM'NONSuR"x uaEEO MATERIALFROMREMo eDFROMIX AvanorvsarvDRaNwATERTocouecnRRRUNOFFARR.DONOTDBE <br /> ONCSU ACE STROKE CRO-SE TO LENGTH CAVA TONS FOR LTE uHUTEsas TEMPORARY DRAINAGE DITCHES.REMOVE ALL TRASH,DEBRIs a N.REIGN <br /> RIAL <br /> PART 1 -GENERAL CAL3.1 LCIUMHL RIDEDUSHALL <br /> I GH METHODSSHALCONIRMTOAGISTANDARD`9AND GPSTAMDARo mss. AALL NDBAR UCTVAPR a�RECOVERY ND ENT LIN SHALL TRENCHES PRIOR TO PI_ACING PIPING SL°oEs FROM TAN'CK S.�„E'IMUMIAL FCINLOW No11V ON E SIDE <br /> 3.6 NOT REMOVE FORMS UNTIL CONCRETE-AS ATTND SUFFICIENT STRENGTH TO SUPPoRTANY AMINIMUM OFOF BACK FILL MATERIAL ABOVE. <br /> ,., REpU R'ft"'INOGNJMNCT°ON NA HOF PRO'RER Y°NC�OENTARL TO CAONCRE'TE.SEINICES,EQDRMENTANDAPPLANCR 6LIPERI PO9ESINA�6LTN 3. O EEOPUMP,FLLPIPE. R6 AND VAPOR RECOVERY ADAPTER SHALL BE LOCATED AT TANK <br /> 39 PATCHING NO PATCHING SHALL OCCUR UNTIL APPROVED BY OWNER FENRINGS ASSHOWNQry NE <br /> TOGA GING ADNP <br /> DRAWINGS.U <br /> PART 2-PRODUCTS BAS TEMPE-RE 3.10 FILPIPESHALLHAVEOVRSPILLCONTAINMENTSYSTEMIN-EDA33HOWNONORAWING3. W o <br /> 2.1 MATERIALS. 3.10.1 COLDBEGRTHEN:WHEN MFAMD.NL EM ERATRUFEO°CONCRETE BEIW EN'SEANDRI DEGREES 3., LENGTHS ITH9oNI3HEBD HU9 M°LCAT WILL BE'WIPHIN S•N(.OOR_ OF HE O FTHEMANB��T TG THE FRRR <br /> 2,.1 ASTMCz OT.PROTE MANUFACTUREDBYPROTIXINDUSTRIROR FAHRENHEITFOR MINIMUM'oF12 HOUR.. 3.12 OVERPILL PREVENTION DEVICES SHALL BE INSTALLED A6 SHOWN IN DRAWINGS. �`rf <br /> APPROVED E'D_ 3102 HIT WEATHER.MAKE ARRANGEMENTS FOR INSTALunON OF WNDBRE SHADING FOG PRA <br /> TCONFORMToa CF50TYPEITYPE11WHREWATERSOLUBESULFATES _'NKN.PNDN..R_TC_ERN NAwa H FIBACEMENTTAIioE=ROTEcnEY' a HEoSPErvsEaeoxRmEsLvnL emuereEAirvs�uEowrRNEsHenRsEcnoR�us°nrrHoocoFmEuRDTo y <br /> .. <br /> ARE RREseNT MEA QUICKLY AS CONCRETE HARDENING ANDPINISHHINc oFERanouswTUALLOW. <br /> 213 AGGREGATES CONFORM TO ASTM C33 3. TESTING:CONCRETE TESTS SHALL BE ORDERED AT THE DISCRETION OF THE OWNER'S COrvs3RUCTION MANAGER.THE gSPEI`ALL FIFING IS COMPLETE AND RIOR TO BACK FILLINGOALLPIFING INCLUDING VENT LINES SHALL BE ISOLATED <br /> ALLPAY R�IHREQDIRRFRIQRTOPLACEMENTOFANY <br /> 2,4 WATER SHALL BE CLFANAND POTABLE ONTRACT OWNERSENGINEERIUG SERVICES oR WMPkGTGNTE NGTESUSTRTSWTLLBE FROM THE TANK AND TESTFD FEIN MANUFacnRERS TESTING INSTRUCTIONS. <br /> z.,.s sArvo.cRFoam TOA3TM w44. 32rTMIDKo SQaWNER. <br /> 3.15 IF sHau BELE, P RISER IS TO BE LENGTHENED,THE PROPER WALL RISER AS PRODUCED BY MANUFACTURER v <br /> 2.1.6 60(EXCEPT WHERE NOTED OTHER WISE) 3.121 KS SHALL LAB WITHKV REINFORCING BARS AT,2"oC EACH WAY EWIPMENT SHALL BE STpWN ON EQDIPMENT LIST RRR TO LIST OF <br /> nLLOLs>ERErvcRN'eo,OaoPsioRM TO Ac,S,cRaDE TEs(CHAIR).A INFORCIN ROUND MANHOLES IN UPPER PORTION OF 3., MATeainLFe sTIFR%Eo evoowNeaLINc o N (G <br /> 2.,i AORIE6INCWDINGBAR6UPPoRT.,CHNRPAGEs,ETC.,SHALL BE COLDDRAWN WIRE WTH THE TANK STAR HALL ON55ADDLES(CHAIRS).GA 3.1 OBSERVATION WELL.WHEN REQUIRED SHALL BE INSTALLED.WELLS ARE TO BE POSITIONED IN EXCAVATION HOLE O U U <br /> HTiRlouei:Es oRlHliwouaoicH CIH�AIasNo.Hcv wT'iHwrLOEo vTaies oN eoi-roti`ns PRE 3.1zz wPv swss sHALLBP GONCRAIEREINFORCE NTSHALLBEn SAT16 OCEACHwAY. CINGBEODINC MATRIALAND SUPPORTED TO REMAIN VERTICAL ouRlrvc BACK FILL REaAnoNs.BOTroM OF O1 <br /> RLNFORCEMRT.HALL BE ON 2"SADDLE.(CHAIRS).ME P LLIS)SHALL BE 12 MINIMUM Blow THE BOTTOM OF TANK EXCAVATION PIT.TOP OF FRE TO TERMINATE W N C <br /> MANUFACTURED BY HOHMANNB BERNARO,INC. IN1]E DIMEETER OBSERVATION BOX.SLOTTED SAMPLE WELL MATERIAL SHALL BE FURNISHED BY CONTRACTOR LOCKING N Q m <br /> 2.19 FORMS DEFORMATIONS ETA sHALUMBER OFMOISTURERRISTANT PLYWOOD.KNOT HOLES 3. BT THE CANOPY COMPANY.ALL MATERiALs LI1Aii BISEaDALTo OLE ION T"T"TOR A' EIs�ERoNOR SUPPLIED <br /> . CAPS AND KEYED LocI(s PROVIDEDTo 7-ELEVEN,INc.RRRESENTATIVE <br /> CLEANS NOT FOOnNGs.CaNDW ToT COD-THE NFRA 30 FLAMMABLE AND BUs LIQUIDS CODE¶a NFPA SVA AUTOMOBILE AND MARINE {� <br /> SAB EXPANSION JOINT RLRS'.ASPHALT IMPREGNATED FIBERBOARD CONFORMING TO ASTM DE0.T. 3. TEC�IOSURFACR AGAINST ANYNOFAILLCONCRE'TESURFDPMAGEACES T WLATSOEVER I.THEIR PoNNCL'U'gNG EXCESSIVE LOADIIJGTY OF THE GENERAL TSHIPPING CRACKINRACTOR TO PROTECT G 31 ADHERED TO UNLESS LOCAL GOVERNING AUTHORITIES DICTATE HIGHER OR <br /> USETHITDFILL VOID WITH GASOLINERESISTAIN SEALERIAL HALLBE.E OBELOW STN NIR PALMSPLATTERS,ETC.THE OWNER IXPECT.IXPOSED CONCRETE SURFACES TO QBE CLEANHNDOFUNIFORM MORESTRINGENTT REQUREMMEENTS WHICHE LL STATION CODE IS By REFERENCE MADE A TOF THI93PECIFIC4 oN.SAID ' N ❑ Q U <br /> TOP SURFACE OF SLAB COLORANDTEXTREAT COMPLETION OF THEPROJECT.REPLACPNY CONCRETE DAMAGE DURING CONS OCTION. PRIOR TO STARTUPANDCHECKOUTOF-EM,9PR ODUCTUNESSHALLPASSITYDROSTATIC LINETEST.ALL <br /> 2 2.1.10 CALCIUM CHLORIDE NOT PERMITTED. 3.15 GRADE CONTROL ESTABLI.HAND MAINTAIN LINES NDGRAGES FOR GONCRETEITEM.. Sp 3.19 W INSPECTIONS METING INCLUDINNLALLBETS AND PERFO PELI RFORMED SHALL <br /> LLB INC.COMPLETEDI PRIOR <br /> ORTO THIS TESSTNE <br /> �p BSS Sd� <br /> g RAISE oN DRAWINGS oR REQUIRED OTHGUARANTEE <br /> RWISE BY COGE6 SHALL BE - RDI n�mS; <br /> 9 3 NUP ALL DEBRIS CAUSED BY THE WORK OF THIS.ECRON,KDINGTHEPREMISESCLEANANDNENTAT y msE FNees�,- <br /> CONTENTSsHA M'RET'EIW112 IAHHONI IF EEN4z AND 7x. ER PER BAR or cEMENTarvD NOT MORE EANA4 SWAP NR AU TINES ne".< HiQ mR <br /> €Sao@ <br /> Ime.�ag%&mw�& s <br /> 3 <br /> x asf <br /> n 4xM,Mre ry� <br /> oti <br /> gSHEET: <br /> G15.0 <br /> FUELING-USA <br />